FreeEvery fee straight from the official city and county fee schedules. No signup.

Globe, AZ Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Globe, straight from the official fee schedule, with a free permit fee calculator below.

In Globe, a building permit for a $50,000 remodel runs $1,476.75 in permit fees, a $20,000 re-roof $375.51, a $10,000 HVAC change-out $170.00, a $10,000 electrical panel upgrade or rewire $64.49, and a $10,000 whole-house repipe $116.21. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of Globe 2025 Fee Schedule (Resolution 1904, Exhibit A)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Globe permit portal, or call 928-425-7146.

How Globe values a job: Valuation for new residential and commercial construction is based on the annual February publication of the ICC Building Valuation Data Table.

Schedule effective May 1, 2025. Last verified: October 13, 2026

Globe Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Globe

Re-roof or roof replacement (stand-alone permit, 60% of the permit fee table)
tiered rates by job value‡
Stand-alone permit: 60% of the permit valuation fee table, which steps at its printed breakpoints (for example $64.80 at $2,000 to $58.20 for the first $2,001, and $251.40 at $25,000 to $327.00 for the first $25,001).
Up to $500
$19.80
Over $500, up to $501
$19.80
Over $501, up to $2,000
$19.80 plus $3.00 per additional $100
Over $2,000, up to $2,001
$58.20
Over $2,001, up to $25,000
$58.20 plus $8.40 per additional $1,000
Over $25,000, up to $25,001
$327.00
Over $25,001, up to $50,000
$327.00 plus $8.40 per additional $1,000
Over $50,000, up to $50,001
$538.20
Over $50,001, up to $100,000
$538.20 plus $5.40 per additional $1,000
Over $100,000, up to $100,001
$830.40
Over $100,001, up to $500,000
$830.40 plus $4.20 per additional $1,000
Over $500,000, up to $500,001
$2,416.20
Over $500,001, up to $1,000,000
$2,416.20 plus $3.00 per additional $1,000
Over $1,000,000, up to $1,000,001
$4,696.20
Over $1,000,001, up to $5,000,000
$4,696.20 plus $1.80 per additional $1,000
Over $5,000,000, up to $5,000,001
$10,996.20
Over $5,000,001
$10,996.20 plus $0.60 per additional $1,000
Administrative Fee (Stand-Alone Permit)
$30.00‡
Plan Review Fee
65% of the permit fee (65% of the permit fee.)‡
Inspection (Per Hour, After Hours or Same Day) (if applicable)
$140.00 per hour
Inspection (Per Hour, Normal Business Hours) (if applicable)
$70.00 per hour
Permit Extension, second 180 days (if applicable)
50% of the permit fee‡
Permit Extension, second 90 days (if applicable)
25% of the permit fee‡
Re-inspection (Per Hour) (if applicable)
$70.00 per hour

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Roofer in Globe

Homeowners and contractors planning a project check Globe roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Globe Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
$
$500$100,000
Estimated roofing permit fee
$375.51
Included in this total
Roofing Permit Fee$209.40‡
$58.20 + 18 × $8.40 per $1,000 over $2,001 (see the fee table above)
Stand-alone permit: 60% of the permit valuation fee table, which steps at its printed breakpoints (for example $64.80 at $2,000 to $58.20 for the first $2,001, and $251.40 at $25,000 to $327.00 for the first $25,001).
Administrative Fee (Stand-Alone Permit)$30.00‡
Plan Review Fee$136.11‡
Total Estimate$375.51

‡ Awaiting confirmation from the jurisdiction.

Valuation for new residential and commercial construction is based on the annual February publication of the ICC Building Valuation Data Table.

Estimate only. Confirm with the Globe building department before applying. Apply online. Phone: 928-425-7146. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Roofer in Globe

Homeowners and contractors planning a project check Globe roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Globe

Construction permits in Globe are issued after an online application and plans are submitted through the city's Citizenserve online portal, the plans are reviewed and approved, and all fees are paid. Contact the permitting department before you start work to find out whether your project needs a permit. The Building Department is at Globe City Hall, 150 N. Pine Street, and the Permit Technician answers questions from 8:00 a.m. to 4:30 p.m., Monday through Friday, at 928-425-7146. Fees come from the City of Globe 2025 Fee Schedule (Resolution 1904).

Source: Globe application instructions

Apply online: Globe permit portal
Building Department Contact
Address
Globe City Hall, 150 N. Pine Street, Globe, AZ 85501
Hours
Monday to Friday, 8:00 a.m. to 4:30 p.m.

Globe Permit Fee FAQs

How Much Does a Building Permit Cost in Globe?

The building permit for a $50,000 residential remodel runs $1,476.75, including the documented surcharges and minimum fees. The estimate is built from Globe's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Globe?

The roofing permit for a $20,000 residential re-roof runs $375.51, based on Globe's sourced fee schedule.

How Are Permit Fees Calculated in Globe?

A residential building permit is tiered rates by job value. Electrical, Plumbing, and Roofing permits scale with the value of the job; Mechanical / HVAC permits are flat fees for the default job (Residential HVAC or evaporative cooler replacement with ductwork), while other work scales with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Globe?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (65% of the permit fee (65% of the permit fee.)). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Globe 2025 Fee Schedule (Resolution 1904, Exhibit A). See the official schedule. Last verified .

Other Jurisdictions in Gila County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.