Thatcher, AZ Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Thatcher, straight from the official fee schedule, with a free permit fee calculator below.

In Thatcher, a building permit for a $50,000 remodel runs $325.00 in permit fees, a $20,000 re-roof $143.00, a $10,000 HVAC change-out $83.00, a $10,000 electrical panel upgrade or rewire $83.00, and a $10,000 whole-house repipe $83.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Town of Thatcher Schedule of Fees and Charges (Updated 6/2024), Building Permit Fees section

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Thatcher permit portal, or call 928-428-2290.

How Thatcher values a job: Thatcher prices building permits on the total valuation of the work, which its permit applications ask for as the project cost.

Schedule effective August 21, 2023. Last verified: October 13, 2026

Thatcher Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Thatcher

Stand-alone electrical or solar work (priced on the construction valuation table)
tiered rates by job value‡
Billed per dollar; the $25,001 band's printed $200 base is $27 above the $173 the band below reaches
Up to $500
$20.00
Over $500, up to $2,000
$20.00 plus $10.00 per additional $1,000
Over $2,000, up to $25,000
$35.00 plus $6.00 per additional $1,000
Over $25,000, up to $50,000
$200.00 plus $5.00 per additional $1,000
Over $50,000, up to $100,000
$325.00 plus $3.00 per additional $1,000
Over $100,000, up to $500,000
$475.00 plus $2.50 per additional $1,000
Over $500,000
$1,475.00 plus $1.50 per additional $1,000

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Thatcher

Homeowners and contractors planning a project check Thatcher electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Thatcher Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type

Fees in Thatcher are the same either way.

Kind of work

Fees in Thatcher are the same either way.

$
$500$100,000
Estimated electrical permit fee
$83.00
Electrical Permit Fee$83.00‡
$35.00 + $8,000 × $6.00 per $1,000 over $2,000 (see the fee table above)
Billed per dollar; the $25,001 band's printed $200 base is $27 above the $173 the band below reaches
Total Estimate$83.00

‡ Awaiting confirmation from the jurisdiction.

Thatcher prices building permits on the total valuation of the work, which its permit applications ask for as the project cost.

Estimate only. Confirm with the Thatcher building department before applying. Apply online. Phone: 928-428-2290. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Thatcher

Homeowners and contractors planning a project check Thatcher electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Thatcher

Apply online through the Town of Thatcher permit portal (iWorQ). The Building Permit Application covers residential or commercial buildings, additions, remodels, outbuildings and pools; a separate Other Permit Application covers solar, electrical, gas and plumbing work. Both ask for the project cost, which sets the permit fee. Upload plans in PDF format and contractor documentation and licenses; the portal links the Single Residence Site Plan Checklist. Questions go to Town Hall at 928-428-2290, Monday through Thursday, 7:00 am to 6:00 pm.

Source: Thatcher application instructions

Apply online: Thatcher permit portal
Building Department Contact
Address
3700 W. Main St., Thatcher, AZ 85552
Hours
Monday - Thursday 7:00 am - 6:00 pm

Thatcher Permit Fee FAQs

How Much Does a Building Permit Cost in Thatcher?

The building permit for a $50,000 residential remodel runs $325.00, including the documented surcharges and minimum fees. The estimate is built from Thatcher's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Thatcher?

The roofing permit for a $20,000 residential re-roof runs $143.00, based on Thatcher's sourced fee schedule.

How Are Permit Fees Calculated in Thatcher?

A residential building permit is tiered rates by job value. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Thatcher Schedule of Fees and Charges (Updated 6/2024), Building Permit Fees section. See the official schedule. Last verified .

Other Jurisdictions in Graham County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.