Parker, AZ Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Parker, straight from the official fee schedule, with a free permit fee calculator below.
Parker has had a building moratorium since May 20, 2025 (Resolution 05-2025): the Town is not accepting, processing, or issuing permits for construction that needs a new connection to the Colorado River Sewage System, which is at capacity. Work that needs no new sewer connection is not covered by it. Call the Town at 928-669-9265 before applying. See the official notice
In Parker, a building permit for a $50,000 remodel runs $1,101.79 in permit fees, a $20,000 re-roof $75.00, a $10,000 HVAC change-out $301.54, a $10,000 electrical panel upgrade or rewire $301.54, and a $10,000 whole-house repipe $301.54. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorTown of Parker Schedule of Fees and Rates (Res. 06-2025, effective 8/1/2025)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Call the building department at 928-669-9265.
How Parker values a job: Parker's permit application asks for the contractor's valuation of the work with a copy of the contract page showing the total price, and the Town's office section also records an ICC valuation, so ask the Town which figure it charges on.
Schedule effective August 1, 2025. Last verified: October 13, 2026
Parker Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Mechanical / HVAC Permit Fees in Parker
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Parker mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageParker Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Parker are the same either way.
2 documented rates for this permit type; pick the one that matches your job.
‡ Awaiting confirmation from the jurisdiction.
Parker has had a building moratorium since May 20, 2025 (Resolution 05-2025): the Town is not accepting, processing, or issuing permits for construction that needs a new connection to the Colorado River Sewage System, which is at capacity. Work that needs no new sewer connection is not covered by it. Call the Town at 928-669-9265 before applying. See the official notice
Parker's permit application asks for the contractor's valuation of the work with a copy of the contract page showing the total price, and the Town's office section also records an ICC valuation, so ask the Town which figure it charges on.
Estimate only. Confirm with the Parker building department before applying. Phone: 928-669-9265. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Parker mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Parker
Parker has its own Community Development Department at 1314 11th Street. The Town's site lists no online permit portal, so permit applications are completed on the Town's paper Permit Application form (linked on the Community Development page) and submitted to that office. Include two sets of construction plans and a site plan (commercial plans must be stamped by a licensed architect), a copy of the contract total page for the contractor valuation, and for projects over $50,000 a copy of the Arizona bonding certificate or waiver. The form asks you to allow 5 to 7 working days for processing. To schedule an inspection call 928-669-9265, extension 1019, or email topbuilding@townofparkeraz.us, at least 24 hours ahead.
Source: Parker application instructions
- Phone
- 928-669-9265
- Inspection Line
- 928-669-9265 ext. 1019
- Fax
- 928-669-5247
- Address
- 1314 11th Street, Parker, AZ 85344
- Hours
- Monday to Thursday, 7:00am to 6:00pm, closed holidays
- Source
- Official contact page
Parker Permit Fee FAQs
How Much Does a Building Permit Cost in Parker?
How Much Does a Roofing Permit Cost in Parker?
How Are Permit Fees Calculated in Parker?
What Surcharges Are Added to Permits in Parker?
Where Do These Fees Come From?
Other Jurisdictions in La Paz County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.