FreeEvery fee straight from the official city and county fee schedules. No signup.

Parker, AZ Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Parker, straight from the official fee schedule, with a free permit fee calculator below.

Parker has had a building moratorium since May 20, 2025 (Resolution 05-2025): the Town is not accepting, processing, or issuing permits for construction that needs a new connection to the Colorado River Sewage System, which is at capacity. Work that needs no new sewer connection is not covered by it. Call the Town at 928-669-9265 before applying. See the official notice

In Parker, a building permit for a $50,000 remodel runs $1,101.79 in permit fees, a $20,000 re-roof $75.00, a $10,000 HVAC change-out $301.54, a $10,000 electrical panel upgrade or rewire $301.54, and a $10,000 whole-house repipe $301.54. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Town of Parker Schedule of Fees and Rates (Res. 06-2025, effective 8/1/2025)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Call the building department at 928-669-9265.

How Parker values a job: Parker's permit application asks for the contractor's valuation of the work with a copy of the contract page showing the total price, and the Town's office section also records an ICC valuation, so ask the Town which figure it charges on.

Schedule effective August 1, 2025. Last verified: October 13, 2026

Parker Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Mechanical / HVAC Permit Fees in Parker

Single-trade mechanical permit
tiered rates by job value
Up to $5,000
$50.00
Over $5,000, up to $25,000
$112.75 plus $14.00 per additional $1,000
Over $25,000, up to $50,000
$392.75 plus $11.00 per additional $1,000
Over $50,000, up to $100,000
$667.75 plus $7.00 per additional $1,000
Over $100,000, up to $500,000
$1,017.75 plus $6.00 per additional $1,000
Over $500,000, up to $1,000,000
$3,417.75 plus $5.00 per additional $1,000
Over $1,000,000
$5,917.75 plus $4.00 per additional $1,000
Combination permit for a single equipment installation, mechanical
tiered rates by job value‡
Up to $5,000
$75.00
Over $5,000, up to $25,000
$112.75 plus $14.00 per additional $1,000
Over $25,000, up to $50,000
$392.75 plus $11.00 per additional $1,000
Over $50,000, up to $100,000
$667.75 plus $7.00 per additional $1,000
Over $100,000, up to $500,000
$1,017.75 plus $6.00 per additional $1,000
Over $500,000, up to $1,000,000
$3,417.75 plus $5.00 per additional $1,000
Over $1,000,000
$5,917.75 plus $4.00 per additional $1,000
Plan Review Fee (Single-Trade and Combination Permits)
65% of the permit fee‡
The 65% building plan review rate, unconfirmed for trade permits since the trade schedule prints no plan review line; plus the engineer's direct cost, which the schedule does not price
After-Hours Inspection (2-hour minimum) (if applicable)
$125.00 per hour
Reinspection Fee (if applicable)
$75.00 per inspection
Weekend Inspection (4-hour minimum) (if applicable)
$175.00 per hour

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured HVAC Company in Parker

Homeowners and contractors planning a project check Parker mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Parker Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Parker are the same either way.

Job type

2 documented rates for this permit type; pick the one that matches your job.

$
$500$50,000
Estimated mechanical / HVAC permit fee
$301.54
Included in this total
Mechanical / HVAC Permit Fee$182.75
$112.75 + 5 × $14.00 per $1,000 over $5,000 (see the fee table above)
Plan Review Fee (Single-Trade and Combination Permits)$118.79‡
Total Estimate$301.54

‡ Awaiting confirmation from the jurisdiction.

Parker has had a building moratorium since May 20, 2025 (Resolution 05-2025): the Town is not accepting, processing, or issuing permits for construction that needs a new connection to the Colorado River Sewage System, which is at capacity. Work that needs no new sewer connection is not covered by it. Call the Town at 928-669-9265 before applying. See the official notice

Parker's permit application asks for the contractor's valuation of the work with a copy of the contract page showing the total price, and the Town's office section also records an ICC valuation, so ask the Town which figure it charges on.

Estimate only. Confirm with the Parker building department before applying. Phone: 928-669-9265. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured HVAC Company in Parker

Homeowners and contractors planning a project check Parker mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Parker

Parker has its own Community Development Department at 1314 11th Street. The Town's site lists no online permit portal, so permit applications are completed on the Town's paper Permit Application form (linked on the Community Development page) and submitted to that office. Include two sets of construction plans and a site plan (commercial plans must be stamped by a licensed architect), a copy of the contract total page for the contractor valuation, and for projects over $50,000 a copy of the Arizona bonding certificate or waiver. The form asks you to allow 5 to 7 working days for processing. To schedule an inspection call 928-669-9265, extension 1019, or email topbuilding@townofparkeraz.us, at least 24 hours ahead.

Source: Parker application instructions

Building Department Contact
Inspection Line
928-669-9265 ext. 1019
Address
1314 11th Street, Parker, AZ 85344
Hours
Monday to Thursday, 7:00am to 6:00pm, closed holidays

Parker Permit Fee FAQs

How Much Does a Building Permit Cost in Parker?

The building permit for a $50,000 residential remodel runs $1,101.79, including the documented surcharges and minimum fees. The estimate is built from Parker's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Parker?

The roofing permit for a $20,000 residential re-roof runs $75.00, based on Parker's sourced fee schedule.

How Are Permit Fees Calculated in Parker?

A residential building permit is tiered rates by job value. Electrical, Plumbing, and Mechanical / HVAC permits scale with the value of the job; Roofing permits are flat fees. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Parker?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (65% of the permit fee), Plan Review Fee (Manufactured, Modular, or Park Model Home) (15% of the permit fee) and Plan Review Fee (Single-Trade and Combination Permits) (65% of the permit fee). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Parker Schedule of Fees and Rates (Res. 06-2025, effective 8/1/2025). See the official schedule. Last verified .

Other Jurisdictions in La Paz County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.