FreeEvery fee straight from the official city and county fee schedules. No signup.

Oro Valley, AZ Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Oro Valley, straight from the official fee schedule, with a free permit fee calculator below.

Golder Ranch Fire District reviews fire plans and inspects fire systems in Oro Valley under its own fee schedule; those fire district fees are not included in these estimates. See the official notice

In Oro Valley, a building permit for a $50,000 remodel runs $1,063.01 in permit fees, a $20,000 re-roof $321.25, a $10,000 electrical panel upgrade or rewire $54.00, and a whole-house repipe $170.50. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Town of Oro Valley Building Valuation Data Schedule and Construction Permit Fee Schedules (adopted by Resolution (R)07-01; Town Code Section 6-1-4)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Oro Valley permit portal, or call 520-229-4800.

How Oro Valley values a job: Permit valuations are set by the Building Official from the Town of Oro Valley Building Valuation Data Schedule and its Miscellaneous Structures schedule, and applicants provide a construction contract or professional estimate of the work's cost to help set the final valuation.

Last verified: October 13, 2026

Oro Valley Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Oro Valley

Re-roof with different materials or added roof load (valuation table)
tiered rates by job value‡
Each band starts from the base the Town prints for it: the band over $25,000 starts at $391.75 although the band beneath reaches $391.25 at $25,000, and the band over $50,000 starts at $643.75 although the band beneath reaches $644.25 at $50,000.
Up to $500
$23.50
Over $500, up to $2,000
$23.50 plus $3.05 per additional $100
Over $2,000, up to $25,000
$69.25 plus $14.00 per additional $1,000
Over $25,000, up to $50,000
$391.75 plus $10.10 per additional $1,000
Over $50,000, up to $100,000
$643.75 plus $7.00 per additional $1,000
Over $100,000, up to $500,000
$993.75 plus $5.60 per additional $1,000
Over $500,000, up to $1,000,000
$3,233.75 plus $4.75 per additional $1,000
Over $1,000,000
$5,608.75 plus $3.65 per additional $1,000
Permit Renewal After Expiration (one half of the new permit fee) (if applicable)
50% of the permit fee
Work Started Before Permit Issuance (fee equal to the permit fee) (if applicable)
100% of the permit fee

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Roofer in Oro Valley

Homeowners and contractors planning a project check Oro Valley roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Oro Valley Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
$
$500$100,000
Estimated roofing permit fee
$321.25
Roofing Permit Fee$321.25‡
$69.25 + 18 × $14.00 per $1,000 over $2,000 (see the fee table above)
Each band starts from the base the Town prints for it: the band over $25,000 starts at $391.75 although the band beneath reaches $391.25 at $25,000, and the band over $50,000 starts at $643.75 although the band beneath reaches $644.25 at $50,000.
Total Estimate$321.25

‡ Awaiting confirmation from the jurisdiction.

Golder Ranch Fire District reviews fire plans and inspects fire systems in Oro Valley under its own fee schedule; those fire district fees are not included in these estimates. See the official notice

Permit valuations are set by the Building Official from the Town of Oro Valley Building Valuation Data Schedule and its Miscellaneous Structures schedule, and applicants provide a construction contract or professional estimate of the work's cost to help set the final valuation.

Estimate only. Confirm with the Oro Valley building department before applying. Apply online. Phone: 520-229-4800. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Roofer in Oro Valley

Homeowners and contractors planning a project check Oro Valley roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Oro Valley

Oro Valley takes permit applications and plans online through the Town's Customer Portal, where you create an account, upload your plans as PDF files, pay fees and schedule inspections. Plan review takes about 7 to 20 business days depending on the project. Simple jobs such as like-for-like HVAC or window and door replacements can be submitted for over-the-counter review on Thursday mornings between 8:00 and 10:30 a.m. by titling the submittal "Over the Counter", and water heater replacement permits are self-issued in the portal. Staff contact you to collect the permit fee once it has been determined, and the Town asks for a construction contract or professional estimate of the project's cost to set the permit valuation. Questions go to the Permitting Division at permits@orovalleyaz.gov or 520-229-4800. Golder Ranch Fire District handles fire plan review and fire inspections under its own fees.

Source: Oro Valley application instructions

Apply online: Oro Valley permit portal
Building Department Contact
Address
11000 N. La Cañada Drive, Oro Valley, AZ 85737
Hours
Monday to Friday, 8 a.m. to 5 p.m.

Oro Valley Permit Fee FAQs

How Much Does a Building Permit Cost in Oro Valley?

The building permit for a $50,000 residential remodel runs $1,063.01, including the documented surcharges and minimum fees. The estimate is built from Oro Valley's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Oro Valley?

The roofing permit for a $20,000 residential re-roof runs $321.25, based on Oro Valley's sourced fee schedule.

How Are Permit Fees Calculated in Oro Valley?

A residential building permit is tiered rates by job value. Electrical permits are flat fees for the default job (Service or panel change, 600 volts or less, up to 200 amperes), while new construction is priced per sq ft; Plumbing permits are priced per fixture; Mechanical / HVAC permits are priced per unit; Roofing permits scale with the value of the job. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Oro Valley?

On top of the base permit fee, the sourced schedule adds Electrical Work Included With a New Building Permit (10% of the permit fee), Mechanical Work Included With a New Building Permit (10% of the permit fee), Plan Review Fee (65% of the permit fee) and Plumbing Work Included With a New Building Permit (10% of the permit fee). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Oro Valley Building Valuation Data Schedule and Construction Permit Fee Schedules (adopted by Resolution (R)07-01; Town Code Section 6-1-4). See the official schedule. Last verified .

Other Jurisdictions in Pima County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.