Tucson, AZ Permit Fees (2026)
Building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Tucson, straight from the official fee schedule, with a free permit fee calculator below.
In Tucson, a building permit for a $50,000 remodel runs $1,575.62 in permit fees, a $20,000 re-roof $772.37, an HVAC change-out $168.54, and an electrical panel upgrade or rewire $168.54. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume one item. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Tucson Planning and Permitting Fee Schedule FY27 (Unified Development Code Technical Standards Sec. 4), effective July 1, 2026
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Tucson permit portal, or call (520) 791-5550.
How Tucson values a job: New construction is valued from the City's ICC-based Construction Valuation Table (cost per square foot by occupancy and construction type); alterations use the signed contract value, per the fee schedule.
Schedules effective July 1, 2025 – July 1, 2026. Last verified: October 13, 2026
Tucson Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Tucson
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Tucson building permit fees here first.
One sponsor per trade, $69 a month, month to month.
Tucson Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
7 documented rates for this permit type; pick the one that matches your job.
‡ Awaiting confirmation from the jurisdiction.
New construction is valued from the City's ICC-based Construction Valuation Table (cost per square foot by occupancy and construction type); alterations use the signed contract value, per the fee schedule.
Estimate only. Confirm with the Tucson building department before applying. Apply online. Phone: (520) 791-5550. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Tucson building permit fees here first.
One sponsor per trade, $69 a month, month to month.
How to Apply for a Permit in Tucson
Apply online through Tucson Development Center Online (TDC Online), the City's permitting portal run by Planning and Development Services: register, upload your plans and documents, pay the invoiced fees, and track your application there. Once the permit is issued, schedule inspections through TDC Online. In person, the Tucson Development Center is at 201 N. Stone Avenue, 1st Floor, open Monday through Thursday, 8 a.m. to 4 p.m. (closed Fridays); staff answer phone and email Monday through Friday, 8 a.m. to 4:30 p.m. Check the City's permit exemptions first, since some work, such as a same-type roof replacement with no structural work, needs no permit.
Source: Tucson application instructions
Apply online: Tucson permit portal- Phone
- (520) 791-5550
- Address
- 201 N. Stone Avenue, 1st Floor, Tucson, AZ
- Hours
- Monday to Thursday, 8 a.m. to 4 p.m.; phone and email Monday to Friday, 8 a.m. to 4:30 p.m.
- Source
- Official contact page
Your name, phone and website right here, next to the building department's contact info, where people look right before they apply.
One expediter per county.
Tucson Permit Fee FAQs
How Much Does a Building Permit Cost in Tucson?
How Much Does a Roofing Permit Cost in Tucson?
How Are Permit Fees Calculated in Tucson?
What Surcharges Are Added to Permits in Tucson?
Where Do These Fees Come From?
Other Jurisdictions in Pima County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.