FreeEvery fee straight from the official city and county fee schedules. No signup.

Superior, AZ Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Superior, straight from the official fee schedule, with a free permit fee calculator below.

Pinal County reviews plans, inspects, and issues building permits in Superior under a 2025 intergovernmental agreement with the Town (County agreement GA25-008), which provides that all permit and inspection fees are paid directly to the County on the Pinal County Building Permit Fee Schedule; the Town handles zoning clearance and fire code review, and any Town fee for those is not included here. See the Pinal County fee schedule

In Superior, a building permit for a $50,000 remodel runs $949.99 in permit fees, a $20,000 re-roof $288.25, a $10,000 HVAC change-out $55.25, an electrical panel upgrade or rewire $69.25, and a whole-house repipe $173.25. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume 200 A service and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Pinal County Building Permit Fee Schedule No. 071013-BPFS (approved by the Board of Supervisors July 10, 2013, effective immediately)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Pinal County reviews plans, inspects, and issues building permits in Superior under a 2025 intergovernmental agreement with the Town (County agreement GA25-008), which provides that all permit and inspection fees are paid directly to the County on the Pinal County Building Permit Fee Schedule; the Town handles zoning clearance and fire code review, and any Town fee for those is not included here. See the Pinal County fee schedule

Apply online at the Superior permit portal, or call 520-509-3555.

How Superior values a job: Pinal County sets the job valuation from its fee schedule's table of February 2012 ICC square-foot construction costs by occupancy and construction type, multiplied by a 0.70 regional modifier (tenant improvements are valued at 40% or 20% of that figure and moved buildings at 50%).

Schedule effective July 10, 2013. Last verified: October 13, 2026

Superior Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Superior

Re-roof or roof repair (building permit fee table by job valuation)
tiered rates by job value‡
Up to $500
$22.00
Over $500, up to $2,000
$22.00 plus $2.75 per additional $100
Over $2,000, up to $25,000
$63.25 plus $12.50 per additional $1,000
Over $25,000, up to $50,000
$350.75 plus $9.00 per additional $1,000
Over $50,000, up to $100,000
$575.75 plus $6.25 per additional $1,000
Over $100,000, up to $500,000
$888.25 plus $5.00 per additional $1,000
Over $500,000, up to $1,000,000
$2,888.25 plus $4.25 per additional $1,000
Over $1,000,000
$5,013.25 plus $2.75 per additional $1,000
Additional Plan Review (Revisions) (if applicable)
$42.00 per hour (additional plan review), minimum $21.00
Inspection Outside Normal Business Hours (if applicable)
$42.00 per hour (after-hours inspection), minimum $84.00
Inspection With No Specific Fee (if applicable)
$42.00 per hour (inspection), minimum $21.00
Investigation Fee (Work Started Without a Permit) (if applicable)
100% of the permit fee
Equal to the permit fee, charged only when work began before a permit was issued
Re-Inspection Fee (if applicable)
$42.00 per hour (re-inspection)

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Roofer in Superior

Homeowners and contractors planning a project check Superior roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Superior Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Superior are the same either way.

$
$500$100,000
Estimated roofing permit fee
$288.25
Roofing Permit Fee$288.25‡
$63.25 + 18 × $12.50 per $1,000 over $2,000 (see the fee table above)
Total Estimate$288.25

‡ Awaiting confirmation from the jurisdiction.

Pinal County sets the job valuation from its fee schedule's table of February 2012 ICC square-foot construction costs by occupancy and construction type, multiplied by a 0.70 regional modifier (tenant improvements are valued at 40% or 20% of that figure and moved buildings at 50%).

Permit fees for Superior are administered by Pinal County; the fees shown are the Pinal County schedule.

Estimate only. Confirm with the Pinal County building department before applying. Apply online. Phone: 520-509-3555. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Roofer in Superior

Homeowners and contractors planning a project check Superior roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Superior

Pinal County Building Safety reviews plans, inspects construction, and issues building permits in the Town of Superior under an intergovernmental agreement with the Town, and permit and inspection fees are paid directly to Pinal County.

Before the County can issue a building permit, the Town of Superior must provide a zoning clearance (or a letter authorizing the County to process the application), so contact the Town first. The Town also performs fire code plan review and fire inspections.

Then apply for the building permit through the Pinal County Citizen Access online permit portal, or contact Pinal County Building Safety in Florence.

Source: Superior application instructions

Apply online: Superior permit portal
Building Department Contact
Address
85 N Florence Street, First Floor, Florence, AZ 85132

Superior Permit Fee FAQs

How Much Does a Building Permit Cost in Superior?

The building permit for a $50,000 residential remodel runs $949.99, including the documented surcharges and minimum fees. The estimate is built from Superior's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Superior?

The roofing permit for a $20,000 residential re-roof runs $288.25, based on Superior's sourced fee schedule.

How Are Permit Fees Calculated in Superior?

A residential building permit is tiered rates by job value. Electrical permits are priced per amp; Plumbing permits are priced per fixture; Mechanical / HVAC permits are flat fees; Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Superior?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (65% of the permit fee). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from Pinal County Building Permit Fee Schedule No. 071013-BPFS (approved by the Board of Supervisors July 10, 2013, effective immediately). See the official schedule. Last verified .

Other Jurisdictions in Pinal County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.