Chino Valley, AZ Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Chino Valley, straight from the official fee schedule, with a free permit fee calculator below.
The Town's fee schedule says its building valuation table is to increase by CPI each July 1 starting in 2026. As of October 13, 2026 the Town has not published an adjusted table or taken Council action on one, so these estimates use the adopted March 1, 2026 table; confirm the current figures with Development Services before you apply. See the official notice
In Chino Valley, a building permit for a $50,000 remodel runs $1,627.79 in permit fees, a $20,000 re-roof $297.00, a $10,000 HVAC change-out $181.50, a $10,000 electrical panel upgrade or rewire $181.50, and a $10,000 whole-house repipe $181.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorTown of Chino Valley Consolidated Fee Schedule, effective March 1, 2026 (Res. 2026-1300)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Chino Valley permit portal, or call (928) 636-3480.
How Chino Valley values a job: Chino Valley sets the valuation from the Town's own per-square-foot table (for example $80 per sq ft for a new home, $100 per sq ft for a residential remodel or addition, and $14 per sq ft for tenant improvements), and the permit fee comes from its Building Valuation Table.
Schedule effective March 1, 2026. Last verified: October 13, 2026
Chino Valley Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Chino Valley
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Chino Valley building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageChino Valley Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Chino Valley are the same either way.
5 documented rates for this permit type; pick the one that matches your job.
The Town's fee schedule says its building valuation table is to increase by CPI each July 1 starting in 2026. As of October 13, 2026 the Town has not published an adjusted table or taken Council action on one, so these estimates use the adopted March 1, 2026 table; confirm the current figures with Development Services before you apply. See the official notice
Chino Valley sets the valuation from the Town's own per-square-foot table (for example $80 per sq ft for a new home, $100 per sq ft for a residential remodel or addition, and $14 per sq ft for tenant improvements), and the permit fee comes from its Building Valuation Table.
Estimate only. Confirm with the Chino Valley building department before applying. Apply online. Phone: (928) 636-3480. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Chino Valley building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Chino Valley
Apply online through the Town's Citizenserve portal by choosing Building Permit. Completed plans and documents must be submitted before the application is accepted, and a non-refundable deposit based on the estimated plan review fee is paid at submittal. A contractor state bond exemption form is required for job values over $50,000.
Inspections are scheduled in Citizenserve or by calling or texting the Town's inspection request line; requests made before midnight can be scheduled for the next business day.
Source: Chino Valley application instructions
Apply online: Chino Valley permit portal- Phone
- (928) 636-3480
- Address
- 1982 Voss Drive #203, Chino Valley, AZ 86323
- Hours
- Monday to Thursday 7 a.m. to 5 p.m., closed Friday
- Source
- Official contact page
Chino Valley Permit Fee FAQs
How Much Does a Building Permit Cost in Chino Valley?
How Much Does a Roofing Permit Cost in Chino Valley?
How Are Permit Fees Calculated in Chino Valley?
What Surcharges Are Added to Permits in Chino Valley?
Where Do These Fees Come From?
Other Jurisdictions in Yavapai County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.