FreeEvery fee straight from the official city and county fee schedules. No signup.

Clarkdale, AZ Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Clarkdale, straight from the official fee schedule, with a free permit fee calculator below.

In Clarkdale, a building permit for a $50,000 remodel runs $800.40 in permit fees, a $20,000 re-roof $50.00, a $10,000 HVAC change-out $0.00, a $10,000 electrical panel upgrade or rewire $50.00, and a $10,000 whole-house repipe $50.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Town of Clarkdale Resolution No. 1764, Town Fee Schedule Exhibit A (adopted July 14, 2026; Town Council agenda packet)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Clarkdale permit portal, or call 928-639-2500.

How Clarkdale values a job: New buildings are valued from the ICC Building Valuation Data square-foot construction costs (August 2007 Building Safety Journal); remodels, additions, and other work use the actual or estimated project cost certified by the contractor, designer, or owner.

Schedule effective July 14, 2026. Last verified: October 13, 2026

Clarkdale Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Plumbing Permit Fees in Clarkdale

Water or sewer line repair or extension
$50.00 flat
Gas line repair or addition (plumbing fee list)
$50.00 flat‡
Gray water system
$35.00 flat
Lawn sprinkler or drip irrigation system
$25.00 flat
Inspection After the Initial Inspection and One Re-Inspection (if applicable)
$100.00

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Plumber in Clarkdale

Homeowners and contractors planning a project check Clarkdale plumbing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Clarkdale Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

4 documented rates for this permit type; pick the one that matches your job.

Estimated plumbing permit fee
$50.00
Plumbing Permit Fee$50.00
$50.00 flat
Total Estimate$50.00

Estimate only. Confirm with the Clarkdale building department before applying. Apply online. Phone: 928-639-2500. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Plumber in Clarkdale

Homeowners and contractors planning a project check Clarkdale plumbing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Clarkdale

Apply for building permits online through the Town of Clarkdale's iWorQ citizen portal, which also lets you search existing permits. Questions go to Community Development at 928-639-2500, 890 Main Street, Monday through Thursday 8 a.m. to 5:30 p.m. and Friday 8 a.m. to noon.

A permit is required for new construction, driveways, fences, structures of any kind, remodeling, roofing, and accessory structures including sheds (Town Code Section 7-17-1). Request inspections 24 hours in advance at 928-639-2500 or inspections@clarkdale.az.gov with the permit number, requested date and time, site address, and type of inspection.

Septic permits come from Yavapai County Environmental Services (928-639-8136), and fire sprinkler review is handled by the Verde Valley Fire District.

Source: Clarkdale application instructions

Apply online: Clarkdale permit portal
Building Department Contact
Address
890 Main Street, Clarkdale, AZ 86324 (mail: P.O. Box 308)
Hours
Monday to Thursday 8 a.m. to 5:30 p.m., Friday 8 a.m. to noon
Building Official
Bob Pipkin, 928-639-2508

Clarkdale Permit Fee FAQs

How Much Does a Building Permit Cost in Clarkdale?

The building permit for a $50,000 residential remodel runs $800.40, including the documented surcharges and minimum fees. The estimate is built from Clarkdale's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Clarkdale?

The roofing permit for a $20,000 residential re-roof runs $50.00, based on Clarkdale's sourced fee schedule.

How Are Permit Fees Calculated in Clarkdale?

A residential building permit is tiered rates by job value. Electrical permits are flat fees for the default job (Wiring revisions or additions in an existing building), while other work is priced per amp; Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Clarkdale?

On top of the base permit fee, the sourced schedule adds Permit Review Charge (covered patios and carports) (10% of the permit fee), Plan Review Fee (new buildings) (65% of the permit fee) and Plan Review Fee (remodels, additions, other work) (20% of the permit fee). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Clarkdale Resolution No. 1764, Town Fee Schedule Exhibit A (adopted July 14, 2026; Town Council agenda packet). See the official schedule. Last verified .

Other Jurisdictions in Yavapai County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.