FreeEvery fee straight from the official city and county fee schedules. No signup.

Hawthorne, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Hawthorne, straight from the official fee schedule, with a free permit fee calculator below.

Building permits inside Hawthorne city limits are issued, inspected and charged by Alachua County's Building Division, so the county's fee schedule applies here. Apply to the City first: its $25 Zoning Certification (City Hall, 6875 SE 221st Street) is required before the county permit and is included in the building, roofing, electrical and plumbing estimates here. See the Alachua County fee schedule

In Hawthorne, a building permit for a $50,000 remodel runs $498.25 in permit fees, a $20,000 re-roof $270.50, a $10,000 HVAC change-out $134.00, a $10,000 electrical panel upgrade or rewire $243.91, and a $10,000 whole-house repipe $243.91. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Alachua County FY25/26 Schedule of Fees and Charges for Services (FY26 Fee Schedule, Effective 02/24/2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Building permits inside Hawthorne city limits are issued, inspected and charged by Alachua County's Building Division, so the county's fee schedule applies here. Apply to the City first: its $25 Zoning Certification (City Hall, 6875 SE 221st Street) is required before the county permit and is included in the building, roofing, electrical and plumbing estimates here. See the Alachua County fee schedule

How Hawthorne values a job: Chargeable valuation is the greater of the ICC Building Valuation Data (BVD) table figure or the stated contract price for the work.

Schedule effective February 24, 2026. Last verified: September 28, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Hawthorne Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Hawthorne

Residential (1–2 family)
$150.00 base, tiered rates by job value
Up to $100,000
$4.40 per $1,000
Over $100,000, up to $1,000,000
$2.50 per $1,000
Over $1,000,000
$1.45 per $1,000
Commercial / 3+ units
$250.00 base, tiered rates by job value‡
Up to $100,000
$4.40 per $1,000
Over $100,000, up to $1,000,000
$2.50 per $1,000
Over $1,000,000
$1.45 per $1,000
Power for new or replacement well
$205.00 flat
City of Hawthorne Zoning Certification
$25.00 (paid to the City before the county permit)‡
Scanning Fee
$20.00
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Private Provider Inspections Reduction
may reduce the permit fee by 25% (Printed as: discounted 25% of the normal building permit fee)†
Additional Inspection Fee (if applicable)
$90.00
After-the-Fact Permit Penalty (if applicable)
100% of the permit fee
Expired Permit Extension and Reissuance Fee (if applicable)
$90.00 (inspection fees not included)
Permit Extension Fee (if applicable)
$90.00
Plan Revision Fee (if applicable)
$50.00 (base; plus $25.00 for each 15 minutes over the first 15 minutes)
Re-inspection Fee (if applicable)
$90.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Hawthorne

Homeowners and contractors planning a project check Hawthorne electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Hawthorne Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

2 documented rates for this permit type; pick the one that matches your job.

Using a private provider?

Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works

$
$500$100,000
Estimated electrical permit fee
$243.91
Included in this total
Electrical Permit Fee$194.00
$150.00 base + $10,000 × $4.40 per $1,000 (see the fee table above)
City of Hawthorne Zoning Certification$25.00‡
Scanning Fee$20.00
State Building Code Administrators Surcharge (F.S. 468.631)$2.91
State Building Permit Surcharge (F.S. 553.721)$2.00
Total Estimate$243.91

‡ Awaiting confirmation from the jurisdiction.

Chargeable valuation is the greater of the ICC Building Valuation Data (BVD) table figure or the stated contract price for the work.

Permit fees for Hawthorne are administered by Alachua County; the fees shown are the Alachua County schedule.

Estimate only. Confirm with the Alachua County building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Hawthorne

Homeowners and contractors planning a project check Hawthorne electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Hawthorne Permit Fee FAQs

How Much Does a Building Permit Cost in Hawthorne?

The building permit for a $50,000 residential remodel runs $498.25, including the documented surcharges and minimum fees. The estimate is built from Hawthorne's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Hawthorne?

The roofing permit for a $20,000 residential re-roof runs $270.50, based on Hawthorne's sourced fee schedule.

How Are Permit Fees Calculated in Hawthorne?

A residential building permit is $150.00 base, tiered rates by job value. Electrical and Plumbing permits scale with the value of the job; Mechanical / HVAC permits are flat fees for the default job, while new construction scales with the value of the job; Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Hawthorne?

On top of the base permit fee, the sourced schedule adds Alachua County Unincorporated - Plan Review Fee (20% of the permit fee), State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Do I Need a Permit for a Small Residential Job in Hawthorne?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Alachua County FY25/26 Schedule of Fees and Charges for Services (FY26 Fee Schedule, Effective 02/24/2026). See the official schedule. Last verified .

Other Jurisdictions in Alachua County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.