Building Permit Fees in Melbourne, FL (2026)
In Melbourne, a $50,000 kitchen remodel runs about $599.84 in permit fees, a $15,000 re-roof about $253.34, an $8,000 HVAC change-out about $184.75, a $12,000 electrical panel upgrade or rewire about $223.80, an $8,000 whole-house repipe about $184.75, and a new $350,000 single-family home about $2,726.45. Totals include the documented surcharges and minimum fees — pick a project to load it in the calculator below.
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $65.00. Fees from City of Melbourne Building Permit Fees (Effective July 1, 2025), last verified July 19, 2026.
Fee details
Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.
‡ Awaiting confirmation from the jurisdiction.
City of Melbourne Building Permit Fees (Effective July 1, 2025)
Schedule effective July 1, 2025. Last verified: July 19, 2026
Fee calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Melbourne are the same either way.
Melbourne calculates permit fees from the estimated cost of construction — the greater of the contracted price or current ICC building valuation data — applied against a tiered fee table.
Estimate only. Confirm with the Melbourne building department before applying.