FreeEvery fee straight from the official city and county fee schedules. No signup.

Building Permit Fees in Inverness, FL (2026)

In Inverness, a building permit for a $50,000 remodel runs $676.88 in permit fees, a $10,000 HVAC change-out $154.20, a $10,000 electrical panel upgrade or rewire $174.90, and a $10,000 whole-house repipe $174.90. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

City of Inverness Community Development Department - Permit Fees (2-page schedule: p.1 building/electrical/plumbing/mechanical/roofing/misc fee table, p.2 Fire Department fee table)

Covers building, electrical, plumbing, and mechanical/HVAC permits.

How Inverness values a job: Construction valuation includes the total value of work - materials and labor - for which the permit is sought, per the city's Permit Application form.

Schedule effective October 9, 2023. Last verified: September 4, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Inverness Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Inverness

All projects
$120.00 for the first $7,500, plus $10.00 per additional $1,000 of job value
Generator
$120.00 for the first $7,500, plus $10.00 per additional $1,000 of job value
Administrative Fee
$30.00
Florida State Surcharge
3.5% of the permit fee, minimum $4.00
Certificate of Completion Fee (if applicable)
$30.00
Certificate of Occupancy Fee (if applicable)
$30.00
Permit Extension Fee (if applicable)
$50.00
Plan Revision Fee (if applicable)
$100.00
Re-Inspection Fee (First) (if applicable)
$50.00
Re-Inspection Fee (Second) (if applicable)
$75.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Inverness

Homeowners and contractors planning a project check Inverness electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Inverness Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Inverness are the same either way.

Rate type
$
$500$100,000
Estimated electrical permit fee
$174.90
Electrical permit fee$140.00
$120.00 for the first $7,500, plus $10.00 per additional $1,000 of job value
Administrative Fee$30.00
Florida State Surcharge$4.90
Total Estimate$174.90

Construction valuation includes the total value of work - materials and labor - for which the permit is sought, per the city's Permit Application form.

Estimate only. Confirm with the Inverness building department before applying.

Sponsor This Page
Be the Featured Electrician in Inverness

Homeowners and contractors planning a project check Inverness electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Inverness Permit Fee FAQs

How Much Is a Building Permit in Inverness?

The building permit for a $50,000 residential remodel runs $676.88, including the documented surcharges and minimum fees. The estimate is built from Inverness's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Are Permit Fees Calculated in Inverness?

A residential building permit is 1.25% of job value, minimum $120.00. Electrical, Plumbing, and Mechanical / HVAC permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Inverness?

On top of the base permit fee, the sourced schedule adds Florida State Surcharge (3.5% of the permit fee, minimum $4.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Inverness?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Inverness Community Development Department - Permit Fees (2-page schedule: p.1 building/electrical/plumbing/mechanical/roofing/misc fee table, p.2 Fire Department fee table). See the official schedule. Last verified .

Compare Permit Fees Across Citrus County

The same job, priced by each jurisdiction's own fee schedule. Across Citrus County's 3 covered jurisdictions, a building permit for a $50,000 remodel runs from $256.25 (Unincorporated Citrus County) to $760.63 (Crystal River).

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Citrus County$256.25$104.00
Crystal River$760.63$314.85
Inverness$676.88n/a

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.