Keystone Heights, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Keystone Heights, straight from the official fee schedule, with a free permit fee calculator below.

Clay County's Building Division issues building, roofing, electrical, plumbing, mechanical, and gas permits for properties inside Keystone Heights city limits and collects the fees on the county's schedule. The City's Public Works Director must first review and approve each application for city zoning; the city publishes no fee for that review. Keystone Heights Code Sec. 15-1 adopts the Clay County Building and Fire Codes by reference. The county's $65 residential zoning review and $10 addressing fee are included in these estimates but may not be charged inside the city, because the city performs zoning review and assigns addresses; confirm with Clay County. See the Clay County fee schedule

In Keystone Heights, a building permit for a $50,000 remodel runs $707.50 in permit fees, a re-roof $205.00, an HVAC change-out $54.00, and an electrical panel upgrade or rewire $76.50. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof, a 3-ton system, and 10 altered circuits. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Clay County BCC FY 2026/2027 Schedule of Fees & Services (Resolution No. 2025/2026-64, adopted 2026-08-25, effective 2026-10-01)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Clay County's Building Division issues building, roofing, electrical, plumbing, mechanical, and gas permits for properties inside Keystone Heights city limits and collects the fees on the county's schedule. The City's Public Works Director must first review and approve each application for city zoning; the city publishes no fee for that review. Keystone Heights Code Sec. 15-1 adopts the Clay County Building and Fire Codes by reference. The county's $65 residential zoning review and $10 addressing fee are included in these estimates but may not be charged inside the city, because the city performs zoning review and assigns addresses; confirm with Clay County. See the Clay County fee schedule

Apply online at the Keystone Heights permit portal, or call (904) 284-6307.

How Keystone Heights values a job: Estimated construction value for permit fee calculation is based on the current International Code Council (ICC) Building Valuation Data table.

Schedule effective October 1, 2026. Last verified: September 26, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Keystone Heights Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Keystone Heights

Residential (1–2 family) (remodel/alteration)
$50.00 base, plus $2.25 per circuit (home run from panel), minimum $50.00
Residential (1–2 family) (new construction)
tiered rates by amps, minimum $50.00
Up to 200 amps
$80.00
Over 200, up to 250 amps
$90.00
Over 250, up to 300 amps
$100.00
Over 300, up to 400 amps
$150.00
Residential (1–2 family): Per Outlet
$50.00 base, plus $0.50 per outlet, minimum $50.00
Residential (1–2 family): Sub Feed
$50.00 flat
Commercial / 3+ units (remodel/alteration)
$50.00 base, plus $0.50 per outlet, minimum $50.00
Commercial / 3+ units (new construction)
tiered rates by amps, minimum $50.00
Up to 200 amps
$80.00
Over 200, up to 300 amps
$100.00
Over 300, up to 400 amps
$150.00
Over 400, up to 600 amps
$200.00
Over 600, up to 800 amps
$250.00
Commercial / 3+ units: Per Circuit (home run)
$50.00 base, plus $1.60 per circuit (home run from panel), minimum $50.00
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Reinspection Fee (if applicable)
$50.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured Electrician in Keystone Heights

Homeowners and contractors planning a project check Keystone Heights electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Keystone Heights Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

2 documented rates for this permit type; pick the one that matches your job.

circuits
140 circuits
Estimated electrical permit fee
$76.50
Included in this total
Electrical Permit Fee$72.50
$50.00 base + 10 circuits × $2.25 per circuit, minimum $50.00
State Building Code Administrators Surcharge (F.S. 468.631)$2.00
State Building Permit Surcharge (F.S. 553.721)$2.00
Total Estimate$76.50

Permit fees for Keystone Heights are administered by Clay County; the fees shown are the Clay County schedule.

Estimate only. Confirm with the Clay County building department before applying. Apply online. Phone: (904) 284-6307. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Keystone Heights

Homeowners and contractors planning a project check Keystone Heights electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Keystone Heights

Keystone Heights does not issue its own building permits. First, submit your plans to the City of Keystone Heights for review and approval by the City's Public Works Director at City Hall, 555 S Lawrence Blvd (352-473-4807). After city approval, apply for the permit with Clay County through its Citizens Access Portal; all Clay County permit applications are submitted online, and county permitting staff can also help in person at the Development Services Building, 435 Walburg Street, Green Cove Springs. Schedule inspections through the same portal, and on the day of an inspection call 904-269-6307 between 7:45 and 8:30 a.m. to learn the inspection time.

Source: Keystone Heights application instructions

Apply online: Keystone Heights permit portal
Building Department Contact
Phone
(904) 284-6307 or (904) 269-6307
Address
Clay County Development Services Building, 435 Walburg Street, Green Cove Springs, FL 32043 (mail: P.O. Box 1366, Green Cove Springs, FL 32043)
Hours
8:00 AM - 4:30 PM (Clay County Board of County Commissioners office hours)

Keystone Heights Permit Fee FAQs

How Much Does a Building Permit Cost in Keystone Heights?

The building permit for a $50,000 residential remodel runs $707.50, including the documented surcharges and minimum fees. The estimate is built from Keystone Heights's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Keystone Heights?

The roofing permit for a residential re-roof runs $205.00, assuming a 2,000 sq ft (20-square) roof (the schedule prices per unit), based on Keystone Heights's sourced fee schedule.

How Are Permit Fees Calculated in Keystone Heights?

A residential building permit is $10.00 per $1,000 of job value, minimum $100.00. Electrical permits are priced per circuit; Plumbing permits are priced per bath; Mechanical / HVAC permits are priced per ton; Roofing permits are priced per square. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Keystone Heights?

On top of the base permit fee, the sourced schedule adds State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Keystone Heights?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Clay County BCC FY 2026/2027 Schedule of Fees & Services (Resolution No. 2025/2026-64, adopted 2026-08-25, effective 2026-10-01). See the official schedule. Last verified .

Other Jurisdictions in Clay County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.