FreeEvery fee straight from the official city and county fee schedules. No signup.

Building Permit Fees in Orange Park, FL (2026)

In Orange Park, a building permit for a $50,000 remodel runs $301.88 in permit fees, a $20,000 re-roof $250.63, and a $10,000 whole-house repipe $174.25. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Town of Orange Park Application and Permit Fee Schedule (Rev. 11/7/2023)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $75.00.

Schedule effective November 7, 2023. Last verified: September 3, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Orange Park Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Orange Park

Residential (1–2 family)
tiered rates (see fee table)
$0–$30,000
$225.00
Over $30,000
$225.00 + $5.00 per $1,000
Commercial / 3+ units
tiered rates (see fee table)
$0–$21,000
$180.00
Over $21,000
$180.00 + $5.00 per $1,000
FL Building Code Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
FL Building Code Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Technology Fee
$20.00
After-the-Fact Permit Fee (if applicable)
100% of the permit fee

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured Roofer in Orange Park

Homeowners and contractors planning a project check Orange Park roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Orange Park Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Orange Park are the same either way.

$
$500$100,000
Estimated roofing permit fee
$250.63
Roofing permit fee$225.00
tiered rates (see fee table)
FL Building Code Surcharge (F.S. 468.631)$3.38
FL Building Code Surcharge (F.S. 553.721)$2.25
Technology Fee$20.00
Total Estimate$250.63

Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.

Estimate only. Confirm with the Orange Park building department before applying.

Sponsor This Page
Be the Featured Roofer in Orange Park

Homeowners and contractors planning a project check Orange Park roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Orange Park Permit Fee FAQs

How Much Is a Building Permit in Orange Park?

The building permit for a $50,000 residential remodel runs $301.88, including the documented surcharges and minimum fees. The estimate is built from Orange Park's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Is a Roofing Permit in Orange Park?

The roofing permit for a $20,000 residential re-roof runs $250.63, based on Orange Park's sourced fee schedule.

How Are Permit Fees Calculated in Orange Park?

A residential building permit is $75.00 base, plus $4.00 per $1,000 of job value or fraction thereof. Electrical permits are priced per outlet/receptacle/switch/fixture; Plumbing permits are priced per fixture; Mechanical / HVAC permits are priced per hvac; Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Orange Park?

The sourced schedule sets a minimum permit fee of $75.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Orange Park?

On top of the base permit fee, the sourced schedule adds FL Building Code Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and FL Building Code Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Orange Park?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Orange Park Application and Permit Fee Schedule (Rev. 11/7/2023). See the official schedule. Last verified .

Compare Permit Fees Across Clay County

The same job, priced by each jurisdiction's own fee schedule. Across Clay County's 4 covered jurisdictions, a building permit for a $50,000 remodel runs from $301.88 (Orange Park) to $672.50 (Unincorporated Clay County).

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Clay County$672.50$220.00
Green Cove Springs$352.50$205.00
Keystone Heights$672.50$220.00
Orange Park$301.88$250.63

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.