FreeEvery fee straight from the official city and county fee schedules. No signup.

Building Permit Fees in Marco Island, FL (2026)

In Marco Island, a building permit for a $50,000 remodel runs $188.93 in permit fees, a $20,000 re-roof $158.56, a $10,000 HVAC change-out $122.68, a $10,000 electrical panel upgrade or rewire $122.68, and a $10,000 whole-house repipe $122.68. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area, a 2,000 sq ft (20-square) roof, and a 200 sq ft job area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Resolution No. 26-26, Administrative Construction Code Fee Schedule (Exhibit A), effective June 1, 2026

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Schedule effective June 1, 2026. Last verified: September 4, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Marco Island Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Marco Island

All projects
$0.20 per square foot under roof, minimum $86.00
All projects
$0.28 per square foot under roof, minimum $86.00
Water heater disconnect
$45.00 flat
FL Building Permit Certification Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
FL Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Plan Review Fee
38% of the permit fee
Electronic Data Conversion Fee (if applicable)
5% of the permit fee, minimum $5.00, maximum $300.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured Electrician in Marco Island

Homeowners and contractors planning a project check Marco Island electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Marco Island Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
square foot under roof
505,000 square foot under roof
Estimated electrical permit fee
$122.68
Electrical permit fee$40.00
200 square foot under roofs × $0.20 per square foot under roof
Minimum permit fee adjustment$46.00
Minimum permit fee: $86.00
FL Building Permit Certification Surcharge (F.S. 468.631)$2.00
FL Building Permit Surcharge (F.S. 553.721)$2.00
Plan Review Fee$32.68
Total Estimate$122.68

Estimate only. Confirm with the Marco Island building department before applying.

Sponsor This Page
Be the Featured Electrician in Marco Island

Homeowners and contractors planning a project check Marco Island electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Marco Island Permit Fee FAQs

How Much Is a Building Permit in Marco Island?

The building permit for a $50,000 residential remodel runs $188.93, assuming a 200 sq ft remodel area where the schedule prices per unit, including the documented surcharges and minimum fees. The estimate is built from Marco Island's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Is a Roofing Permit in Marco Island?

The roofing permit for a $20,000 residential re-roof runs $158.56, assuming a 2,000 sq ft (20-square) roof where the schedule prices per unit, based on Marco Island's sourced fee schedule.

How Are Permit Fees Calculated in Marco Island?

A residential building permit is $0.67 per square foot under roof. Electrical, Plumbing, and Mechanical / HVAC permits are priced per sq ft; Roofing permits are priced per square. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Marco Island?

On top of the base permit fee, the sourced schedule adds FL Building Permit Certification Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00), FL Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00) and Plan Review Fee (38% of the permit fee). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Marco Island?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from Resolution No. 26-26, Administrative Construction Code Fee Schedule (Exhibit A), effective June 1, 2026. See the official schedule. Last verified .

Compare Permit Fees Across Collier County

The same job, priced by each jurisdiction's own fee schedule. Across Collier County's 4 covered jurisdictions, a building permit for a $50,000 remodel runs from $188.93 (Marco Island) to $267.75 (Naples).

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Collier County$204.25$275.50
Everglades City$204.25$275.50
Marco Island$188.93$158.56
Naples$267.75$230.00

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area, a 2,000 sq ft roof and a 2,000 sq ft (20-square) roof. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.