Baldwin, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Baldwin, straight from the official fee schedule, with a free permit fee calculator below.
In Baldwin, a building permit for a remodel runs $144.10 in permit fees, a $20,000 re-roof $144.10, a $10,000 HVAC change-out $74.00, a $10,000 electrical panel upgrade or rewire $74.00, and a $10,000 whole-house repipe $74.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorTown of Baldwin Code of Ordinances Sec. 22-25, Schedule of fees (as amended by Ord. No. 2023-04, 8/15/2023)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Call the building department at 904-266-5030.
How Baldwin values a job: Baldwin prices building permits by square foot and electrical, plumbing and mechanical permits as flat fees. Roof repairs are $7 per $1,000 of repair cost; reroofs are shown at that rate until the Town confirms it.
Schedule effective August 15, 2023. Last verified: September 28, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Baldwin Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Baldwin
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Baldwin building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageBaldwin Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
4 documented rates for this permit type; pick the one that matches your job.
Estimate only. Confirm with the Baldwin building department before applying. Phone: 904-266-5030. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Baldwin building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Baldwin
Building permits in Baldwin are issued by the Town of Baldwin, not the City of Jacksonville. Download the Town's two-page Permit Application, or the Miscellaneous Permit Application for other work, from the Online Forms page of the Town website, or pick one up at Town Hall, 10 US Highway 90 West. Return the completed application to Town Hall with your plans or specifications; Town staff record zoning approval on the application. Proof of insurance and copies of certifications must be on file before a permit can be issued. Electrical work served by JEA also uses the Town's JEA permit form on the same page. Inspections are performed by the Town's building inspector; for permit or inspection questions call the Assistant Town Clerk at 904-266-5030.
Source: Baldwin application instructions
- Office
- Town of Baldwin Town Hall (permits and zoning)
- Phone
- 904-266-5030 (Assistant Town Clerk Misty Sloan); 904-266-5031 (Town Clerk Lula Hill)
- msloan@baldwinfl.com; lhill@baldwinfl.com
- Building Inspector
- Bryan Higginbotham
- Address
- 10 US Highway 90 West, Baldwin, FL 32234
- Source
- Official contact page
Baldwin Permit Fee FAQs
How Much Does a Building Permit Cost in Baldwin?
How Much Does a Roofing Permit Cost in Baldwin?
How Are Permit Fees Calculated in Baldwin?
What Surcharges Are Added to Permits in Baldwin?
Do I Need a Permit for a Small Residential Job in Baldwin?
Where Do These Fees Come From?
Other Jurisdictions in Duval County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.