Baldwin, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Baldwin, straight from the official fee schedule, with a free permit fee calculator below.
In Baldwin, a building permit for a $50,000 remodel runs $144.10 in permit fees, a $20,000 re-roof $144.10, a $10,000 HVAC change-out $74.00, a $10,000 electrical panel upgrade or rewire $74.00, and a $10,000 whole-house repipe $74.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorTown of Baldwin Code of Ordinances Sec. 22-25, Schedule of fees (as amended by Ord. No. 2023-04, 8/15/2023)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Baldwin values a job: Baldwin prices building permits by square foot and electrical, plumbing and mechanical permits as flat fees. Roof repairs are $7 per $1,000 of repair cost; reroofs are shown at that rate until the Town confirms it.
Schedule effective August 15, 2023. Last verified: September 28, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Baldwin Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Plumbing Permit Fees in Baldwin
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Baldwin plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageBaldwin Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Estimate only. Confirm with the Baldwin building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Baldwin plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageBaldwin Permit Fee FAQs
How Much Does a Building Permit Cost in Baldwin?
How Much Does a Roofing Permit Cost in Baldwin?
How Are Permit Fees Calculated in Baldwin?
What Surcharges Are Added to Permits in Baldwin?
Do I Need a Permit for a Small Residential Job in Baldwin?
Where Do These Fees Come From?
Other Jurisdictions in Duval County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.