Bunnell, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Bunnell, straight from the official fee schedule, with a free permit fee calculator below.
In Bunnell, a building permit for a $50,000 remodel runs $471.60 in permit fees, a $20,000 re-roof $228.31, a $10,000 HVAC change-out $154.00, a $10,000 electrical panel upgrade or rewire $234.40, and a $10,000 whole-house repipe $179.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 3-ton system, 200 A service, and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
City of Bunnell Resolution 2024-13 (Building Permit and Inspection Fees), adopted 10/14/2024, effective immediately
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Bunnell values a job: Construction valuation is the greater of the most recent ICC Building Valuation Data (per square foot by construction type and occupancy) or the actual cost of construction as estimated by the design professional or the actual contract price.
Schedule effective October 14, 2024. Last verified: September 5, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Bunnell Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Mechanical / HVAC Permit Fees in Bunnell
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Bunnell mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageBunnell Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Bunnell are the same either way.
Estimate only. Confirm with the Bunnell building department before applying.
Homeowners and contractors planning a project check Bunnell mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageBunnell Permit Fee FAQs
How Much Does a Building Permit Cost in Bunnell?
How Much Does a Roofing Permit Cost in Bunnell?
How Are Permit Fees Calculated in Bunnell?
What Surcharges Are Added to Permits in Bunnell?
Do I Need a Permit for a Small Residential Job in Bunnell?
Where Do These Fees Come From?
Other Jurisdictions in Flagler County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.