FreeEvery fee straight from the official city and county fee schedules. No signup.

Bunnell, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Bunnell, straight from the official fee schedule, with a free permit fee calculator below.

In Bunnell, a building permit for a $50,000 remodel runs $471.60 in permit fees, a $20,000 re-roof $228.31, an HVAC change-out $154.00, an electrical panel upgrade or rewire $234.40, and a whole-house repipe $179.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 3-ton system, 200 A service, and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of Bunnell Resolution 2024-13 (Building Permit and Inspection Fees), adopted 10/14/2024, effective immediately

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Bunnell permit portal, or call 386-437-7516.

How Bunnell values a job: Construction valuation is the greater of the most recent ICC Building Valuation Data (per square foot by construction type and occupancy) or the actual cost of construction as estimated by the design professional or the actual contract price.

Schedule effective October 14, 2024. Last verified: September 30, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Bunnell Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Mechanical / HVAC Permit Fees in Bunnell

All projects
tiered rates by tons, minimum $30.00
Up to 1 tons
$60.00
Over 1, up to 2 tons
$70.00
Over 2, up to 3 tons
$80.00
Over 3, up to 4 tons
$90.00
Over 4, up to 5 tons
$100.00
Over 5 tons
$100.00 plus $10.00 per additional ton
By job value (no declared tonnage)
tiered rates by job value, minimum $30.00
Up to $1,000
$60.00
Over $1,000, up to $2,000
$70.00
Over $2,000, up to $3,000
$80.00
Over $3,000, up to $4,000
$90.00
Over $4,000, up to $5,000
$100.00
Over $5,000
$100.00 plus $10.00 per additional $1,000
Application Fee
tiered by permit fee amount
Up to $200
$20.00
Over $200
$60.00
Development Technology Fee
$10.00
Inspection Fee (Commercial)
$100.00 per inspection
Inspection Fee (Residential)
$40.00 per inspection
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Permit Renewal (after framing inspection) (if applicable)
40% of the permit fee
Permit Renewal (after slab inspection) (if applicable)
60% of the permit fee
Permit Renewal (before final inspection) (if applicable)
20% of the permit fee
Permit Renewal (no inspections performed) (if applicable)
100% of the permit fee
Failure to Obtain Permit Penalty (if applicable)
100% of the permit fee
Permit Extension Request Fee (if applicable)
$25.00
Permit Revision Fee (Commercial) (if applicable)
25% of the permit fee, minimum $60.00
Permit Revision Fee (Residential) (if applicable)
25% of the permit fee, minimum $30.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured HVAC Company in Bunnell

Homeowners and contractors planning a project check Bunnell mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Bunnell Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Bunnell are the same either way.

Job type

2 documented rates for this permit type; pick the one that matches your job.

tons
110 tons
Estimated mechanical / HVAC permit fee
$154.00
Included in this total
Mechanical / HVAC Permit Fee$80.00
$80.00 flat for 3 tons (see the fee table above)
Application Fee$20.00
Development Technology Fee$10.00
Inspection Fee (Residential)$40.00
Assumes 1 inspection; the building department sets the actual count for your project.
State Building Code Administrators Surcharge (F.S. 468.631)$2.00
State Building Permit Surcharge (F.S. 553.721)$2.00
Total Estimate$154.00

Estimate only. Confirm with the Bunnell building department before applying. Apply online. Phone: 386-437-7516. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured HVAC Company in Bunnell

Homeowners and contractors planning a project check Bunnell mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Bunnell

Bunnell runs its own Building Division inside Community Development, so city permits are applied for with the City, not Flagler County. Applications are submitted online through the city's permitting portal, CAP Government's Community Access Portal: fill out the applicable permit application form from the city's Forms page, then upload it with all supporting documents. Hard copy submittals are accepted during business hours at the Community Development office at 2400 Commerce Pkwy. Contractors must hold a current Business Tax Receipt to permit work in the city. Inspections are requested in advance by phone or email through the Building Division at 386-437-7516 or CommDev@BunnellCity.us; residential inspections run Monday through Thursday and commercial inspections are scheduled weekly.

Source: Bunnell application instructions

Apply online: Bunnell permit portal
Building Department Contact
Address
2400 Commerce Pkwy, Bunnell, FL 32110
Hours
Monday - Friday, 7:30 - 4:30

Bunnell Permit Fee FAQs

How Much Does a Building Permit Cost in Bunnell?

The building permit for a $50,000 residential remodel runs $471.60, including the documented surcharges and minimum fees. The estimate is built from Bunnell's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Bunnell?

The roofing permit for a $20,000 residential re-roof runs $228.31, based on Bunnell's sourced fee schedule.

How Are Permit Fees Calculated in Bunnell?

A residential building permit is tiered rates by job value. Electrical permits are priced per amp; Plumbing permits are priced per fixture; Mechanical / HVAC permits are priced per ton; Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Bunnell?

On top of the base permit fee, the sourced schedule adds State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Bunnell?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Bunnell Resolution 2024-13 (Building Permit and Inspection Fees), adopted 10/14/2024, effective immediately. See the official schedule. Last verified .

Other Jurisdictions in Flagler County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.