Flagler Beach, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Flagler Beach, straight from the official fee schedule, with a free permit fee calculator below.
Under Resolution 2026-54 the city charges 75 percent of its adopted building permit fees through June 30, 2027, so the adopted $110.00 base fee is billed at $82.50 and the estimates here reflect the reduced base. The full rate returns July 1, 2027 unless the Commission acts again. See the official notice
In Flagler Beach, a building permit for a $50,000 remodel runs $166.50 in permit fees, a $20,000 re-roof $160.50, a $10,000 HVAC change-out $158.50, a $10,000 electrical panel upgrade or rewire $158.50, and a $10,000 whole-house repipe $158.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Flagler Beach Building Permit Fee Schedule, Effective July 1, 2026 (Exhibit A to Resolution 2026-54), Resolution 2026-54 (adopted June 25, 2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $82.50.
Schedule effective July 1, 2026. Last verified: September 5, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Flagler Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Flagler Beach
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Flagler Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageFlagler Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Flagler Beach are the same either way.
Fees in Flagler Beach are the same either way.
Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.
Under Resolution 2026-54 the city charges 75 percent of its adopted building permit fees through June 30, 2027, so the adopted $110.00 base fee is billed at $82.50 and the estimates here reflect the reduced base. The full rate returns July 1, 2027 unless the Commission acts again. See the official notice
Estimate only. Confirm with the Flagler Beach building department before applying.
Homeowners and contractors planning a project check Flagler Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageFlagler Beach Permit Fee FAQs
How Much Does a Building Permit Cost in Flagler Beach?
How Much Does a Roofing Permit Cost in Flagler Beach?
How Are Permit Fees Calculated in Flagler Beach?
What Is the Minimum Permit Fee in Flagler Beach?
What Surcharges Are Added to Permits in Flagler Beach?
Do I Need a Permit for a Small Residential Job in Flagler Beach?
Where Do These Fees Come From?
Other Jurisdictions in Flagler County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.