Bowling Green, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Bowling Green, straight from the official fee schedule, with a free permit fee calculator below.
Building permits inside Bowling Green city limits are issued, inspected and charged by the Hardee County Building Department under the City's 2025 interlocal agreement with Hardee County, so the county's fee schedule applies here. Apply to the City first: new construction, remodels and additions, roofing and A/C work need the City's $30 Zoning and Comprehensive Plan Consistency sign-off (included in building, roofing and mechanical estimates here). See the Hardee County fee schedule
In Bowling Green, a building permit for a $50,000 remodel runs $365.75 in permit fees, a $20,000 re-roof $566.25, a $10,000 electrical panel upgrade or rewire $184.00, and a $10,000 whole-house repipe $285.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area, a 2,000 sq ft roof, 200 A service, and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorHardee County BOCC Agenda Packet, July 16, 2026 (Resolution No. 2026-40, Exhibit A, Appendix A Building Department Fees)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Building permits inside Bowling Green city limits are issued, inspected and charged by the Hardee County Building Department under the City's 2025 interlocal agreement with Hardee County, so the county's fee schedule applies here. Apply to the City first: new construction, remodels and additions, roofing and A/C work need the City's $30 Zoning and Comprehensive Plan Consistency sign-off (included in building, roofing and mechanical estimates here). See the Hardee County fee schedule
How Bowling Green values a job: Hardee County prices building permits by square footage of the work under Resolution No. 2026-40 rather than by job valuation; where valuation must be confirmed, the county uses contract pricing or its printed per square foot table (Residential $125, Screen Room/Carport/Storage/Garage $30, Commercial/Industrial/Institutional $180 per sq ft).
Schedule effective July 1, 2026. Last verified: September 28, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Bowling Green Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Bowling Green
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Bowling Green electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageBowling Green Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Bowling Green are the same either way.
2 documented rates for this permit type; pick the one that matches your job.
Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works
‡ Awaiting confirmation from the jurisdiction.
Permit fees for Bowling Green are administered by Hardee County; the fees shown are the Hardee County schedule.
Estimate only. Confirm with the Hardee County building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Bowling Green electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageBowling Green Permit Fee FAQs
How Much Does a Building Permit Cost in Bowling Green?
How Much Does a Roofing Permit Cost in Bowling Green?
How Are Permit Fees Calculated in Bowling Green?
What Surcharges Are Added to Permits in Bowling Green?
Do I Need a Permit for a Small Residential Job in Bowling Green?
Where Do These Fees Come From?
Other Jurisdictions in Hardee County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.