FreeEvery fee straight from the official city and county fee schedules. No signup.

Bowling Green, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Bowling Green, straight from the official fee schedule, with a free permit fee calculator below.

Building permits inside Bowling Green city limits are issued, inspected and charged by the Hardee County Building Department under the City's 2025 interlocal agreement with Hardee County, so the county's fee schedule applies here. Apply to the City first: new construction, remodels and additions, roofing and A/C work need the City's $30 Zoning and Comprehensive Plan Consistency sign-off (included in building, roofing and mechanical estimates here). See the Hardee County fee schedule

In Bowling Green, a building permit for a $50,000 remodel runs $365.75 in permit fees, a $20,000 re-roof $566.25, a $10,000 electrical panel upgrade or rewire $184.00, and a $10,000 whole-house repipe $285.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area, a 2,000 sq ft roof, 200 A service, and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Hardee County BOCC Agenda Packet, July 16, 2026 (Resolution No. 2026-40, Exhibit A, Appendix A Building Department Fees)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Building permits inside Bowling Green city limits are issued, inspected and charged by the Hardee County Building Department under the City's 2025 interlocal agreement with Hardee County, so the county's fee schedule applies here. Apply to the City first: new construction, remodels and additions, roofing and A/C work need the City's $30 Zoning and Comprehensive Plan Consistency sign-off (included in building, roofing and mechanical estimates here). See the Hardee County fee schedule

How Bowling Green values a job: Hardee County prices building permits by square footage of the work under Resolution No. 2026-40 rather than by job valuation; where valuation must be confirmed, the county uses contract pricing or its printed per square foot table (Residential $125, Screen Room/Carport/Storage/Garage $30, Commercial/Industrial/Institutional $180 per sq ft).

Schedule effective July 1, 2026. Last verified: September 28, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Bowling Green Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Bowling Green

All projects
$50.00 base, plus $0.10 per sq ft of roof area
Zoning and Comprehensive Plan Consistency Sign-off
$30.00‡
Hardee County - Construction Plans Examination (base)
$80.00‡
Hardee County - Construction Plans Examination (per sq ft)
$0.10 per sq ft of floor area‡
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Hardee County - Private Provider Full Service Fee Reduction (with a private provider for plan review and inspections)
may reduce the permit fee by 50%
Hardee County - Private Provider Full Service Plans Examination Waiver (with a private provider for plan review and inspections)
may reduce designated fees by 100%
100% of the Construction Plans Examination fees (base and per square foot), per the printed 'No plan review fee' clause when a private provider performs both plan review and inspections.
Hardee County - Private Provider Inspections-Only Fee Reduction
may reduce the permit fee by 25%
Hardee County - After Hours Inspection (if applicable)
$150.00 (printed $150 minimum; $75 per hour after 2 hours)
Hardee County - First Re-inspection (if applicable)
$50.00
Hardee County - Renewal of Expired Permit (First Renewal) (if applicable)
$50.00
Hardee County - Renewal of Expired Permit (Second Renewal) (if applicable)
$100.00
Hardee County - Review of Supporting Documents (per set) (if applicable)
$10.00
Hardee County - Revised Plans (First Set of Changes) (if applicable)
$50.00
Hardee County - Revised Plans (Second Set of Changes) (if applicable)
$100.00
Hardee County - Revised Plans (Third and Subsequent Changes) (if applicable)
$200.00
Hardee County - Same Day or Time Specific Inspection (if applicable)
$75.00
Hardee County - Second Re-inspection (if applicable)
$100.00
Hardee County - Subsequent Re-inspection (if applicable)
$150.00
Hardee County - Temporary or Change of Certificate of Occupancy (if applicable)
$100.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Roofer in Bowling Green

Homeowners and contractors planning a project check Bowling Green roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Bowling Green Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Bowling Green are the same either way.

Using a private provider?

Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works

sq ft
5006,000 sq ft
Estimated roofing permit fee
$566.25
Included in this total
Roofing Permit Fee$250.00
$50.00 base + 2,000 sq ft × $0.10 per sq ft
Zoning and Comprehensive Plan Consistency Sign-Off$30.00‡
Hardee County - Construction Plans Examination (Base)$80.00‡
Hardee County - Construction Plans Examination (Per Sq Ft)$200.00‡
State Building Code Administrators Surcharge (F.S. 468.631)$3.75
State Building Permit Surcharge (F.S. 553.721)$2.50
Total Estimate$566.25

‡ Awaiting confirmation from the jurisdiction.

Permit fees for Bowling Green are administered by Hardee County; the fees shown are the Hardee County schedule.

Estimate only. Confirm with the Hardee County building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Roofer in Bowling Green

Homeowners and contractors planning a project check Bowling Green roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Bowling Green Permit Fee FAQs

How Much Does a Building Permit Cost in Bowling Green?

The building permit for a $50,000 residential remodel runs $365.75, assuming a 200 sq ft remodel area where the schedule prices per unit, including the documented surcharges and minimum fees. The estimate is built from Bowling Green's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Bowling Green?

The roofing permit for a $20,000 residential re-roof runs $566.25, assuming a 2,000 sq ft roof where the schedule prices per unit, based on Bowling Green's sourced fee schedule.

How Are Permit Fees Calculated in Bowling Green?

A residential building permit is $100.00 base, plus $0.65 per sq ft of floor area. Electrical permits are priced per amp; Plumbing permits are priced per fixture; Mechanical / HVAC permits are priced per supply; Roofing permits are priced per sq ft. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Bowling Green?

On top of the base permit fee, the sourced schedule adds State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Bowling Green?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Hardee County BOCC Agenda Packet, July 16, 2026 (Resolution No. 2026-40, Exhibit A, Appendix A Building Department Fees). See the official schedule. Last verified .

Other Jurisdictions in Hardee County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.