FreeEvery fee straight from the official city and county fee schedules. No signup.

Brooksville, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Brooksville, straight from the official fee schedule, with a free permit fee calculator below.

In Brooksville, a $20,000 re-roof runs $166.43 in permit fees, a $10,000 HVAC change-out $105.00, a $10,000 electrical panel upgrade or rewire $129.00, and a $10,000 whole-house repipe $129.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of Brooksville Annual Fee Resolution (Resolution No. 2025-19, adopted 2025-09-15)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Brooksville permit portal, or call 352-540-3853.

Schedule effective September 15, 2025. Last verified: September 26, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Brooksville Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Brooksville

Residential (1–2 family): SF x Cost x 0.0055 (R-3, Type VB)
$0.6735 per square foot, minimum $800.00 (Type VB cost 122.46 per sq ft x 0.0055)‡
Residential (1–2 family): Mobile Home Additions
$270.00 flat
Residential (1–2 family): Manufactured/Modular/Mobile Home Set-Up
$400.00 flat
Residential (1–2 family): Park Model Set-Up
$324.00 flat
Residential (1–2 family): R-3 Type 1A construction
$0.8571 per square foot, minimum $800.00 (Type 1A cost 155.84 per sq ft x 0.0055)
Erosion Control Deposit Fee (new construction)
$500.00‡
Site Plan Review (Residential 1-2 Family) (new construction)
$100.00‡
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Additional or Partial Inspection (if applicable)
$54.00 per inspection
After-Hours Inspection (if applicable)
$162.00
Change of Main Contractor (if applicable)
$135.00
Change of Qualifier (if applicable)
$135.00
Duplicate Permit Card (if applicable)
$16.00
Emergency Non-Scheduled Inspection (if applicable)
$108.00
Extension Letter (if applicable)
$54.00
Priority Permit Review (if applicable)
$216.00
Reactivate an Invalid Permit (if applicable)
$54.00
Reinspection Fee (if applicable)
$54.00
Specific-Time Schedule Inspection (if applicable)
$81.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Brooksville

Homeowners and contractors planning a project check Brooksville building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Brooksville Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Brooksville does not have a documented building fee for this project type in our sourced data yet. Check the official fee schedule linked above, or ask the building department.

Estimate only. Confirm with the Brooksville building department before applying. Apply online. Phone: 352-540-3853. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Brooksville

Homeowners and contractors planning a project check Brooksville building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Brooksville

Brooksville's Building Division at City Hall issues permits for properties inside city limits. Check the Hernando County Property Appraiser record first: levy code CWBE means the City permits the work, and levy code CWES means you apply to Hernando County instead. Apply online through the City's CivicGov Permits Portal and attach your plans and supporting documents to the application. If you bring paper documents to City Hall for staff to enter, the City charges a $54.00 processing fee plus per-page fees. After your application is processed, you pay an upfront fee online by card, at the payment tablet on the first floor of City Hall, or by check mailed with your permit number. Schedule inspections through the Permits Portal, and email permits@cityofbrooksville.us to cancel one.

Source: Brooksville application instructions

Apply online: Brooksville permit portal
Building Department Contact
Address
City Hall, 201 Howell Avenue, 1st Floor, Brooksville, FL 34601
Hours
not published on the Building Division page

Brooksville Permit Fee FAQs

How Much Does a Roofing Permit Cost in Brooksville?

The roofing permit for a $20,000 residential re-roof runs $166.43, based on Brooksville's sourced fee schedule.

How Are Permit Fees Calculated in Brooksville?

Electrical and Plumbing permits scale with the value of the job; Mechanical / HVAC permits are flat fees for the default job (A/C change out), while other work scales with the value of the job; Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Brooksville?

On top of the base permit fee, the sourced schedule adds State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Brooksville?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Brooksville Annual Fee Resolution (Resolution No. 2025-19, adopted 2025-09-15). See the official schedule. Last verified .

Other Jurisdictions in Hernando County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.