FreeEvery fee straight from the official city and county fee schedules. No signup.

Building Permit Fees in Brooksville, FL (2026)

In Brooksville, a $20,000 re-roof runs $166.43 in permit fees, a $10,000 HVAC change-out $105.00, a $10,000 electrical panel upgrade or rewire $129.00, and a $10,000 whole-house repipe $129.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

City of Brooksville Annual Fee Resolution (Resolution No. 2025-19, adopted 2025-09-15)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Schedule effective September 15, 2025. Last verified: September 4, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Brooksville Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Brooksville

Residential (1–2 family)
0.55% of job value, minimum $125.00
Residential (1–2 family): Service upgrade/panel change out
$101.00 flat
DBPR/BCAIB State Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
Radon Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Brooksville

Homeowners and contractors planning a project check Brooksville electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Brooksville Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
$
$500$100,000
Estimated electrical permit fee
$129.00
Electrical permit fee$55.00
0.55% of job value, minimum $125.00
Minimum permit fee adjustment$70.00
Minimum permit fee: $125.00
DBPR/BCAIB State Surcharge (F.S. 468.631)$2.00
Radon Surcharge (F.S. 553.721)$2.00
Total Estimate$129.00

Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.

Estimate only. Confirm with the Brooksville building department before applying.

Sponsor This Page
Be the Featured Electrician in Brooksville

Homeowners and contractors planning a project check Brooksville electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Brooksville Permit Fee FAQs

How Much Is a Roofing Permit in Brooksville?

The roofing permit for a $20,000 residential re-roof runs $166.43, based on Brooksville's sourced fee schedule.

How Are Permit Fees Calculated in Brooksville?

Electrical and Plumbing permits scale with the value of the job; Mechanical / HVAC and Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Brooksville?

On top of the base permit fee, the sourced schedule adds DBPR/BCAIB State Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and Radon Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Brooksville?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Brooksville Annual Fee Resolution (Resolution No. 2025-19, adopted 2025-09-15). See the official schedule. Last verified .

Compare Permit Fees Across Hernando County

The same job, priced by each jurisdiction's own fee schedule.

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Hernando County$272.00$302.85
Brooksvillen/a$166.43

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.