FreeEvery fee straight from the official city and county fee schedules. No signup.

Lake Placid, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Lake Placid, straight from the official fee schedule, with a free permit fee calculator below.

Building permits for the Town of Lake Placid are administered by the Highlands County Building Department under the Highlands County Building Code, which the town has adopted in full by ordinance, including fees (Town Code of Ordinances Ch. 47). See the Highlands County fee schedule

In Lake Placid, a building permit for a $50,000 remodel runs $201.96 in permit fees, a $20,000 re-roof $136.00, a $10,000 HVAC change-out $124.00, a $10,000 electrical panel upgrade or rewire $89.00, and a $10,000 whole-house repipe $79.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume 200 A service and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Highlands County Schedule of Fees, Effective October 01, 2025 (FY 25-26), Building Division

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $75.00.

Building permits for the Town of Lake Placid are administered by the Highlands County Building Department under the Highlands County Building Code, which the town has adopted in full by ordinance, including fees (Town Code of Ordinances Ch. 47). See the Highlands County fee schedule

How Lake Placid values a job: Chargeable valuation is $90 per square foot for residential construction or $150 per square foot for commercial construction, or the confirmed contract price, per the Construction Valuation Fees schedule.

Schedule effective October 1, 2025. Last verified: September 6, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Lake Placid Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Lake Placid

1 Phase 120/240 Volt
tiered rates (see fee table), minimum $75.00
0–100 amp
$75.00
100–150 amp
$80.00
150–200 amp
$85.00
200–400 amp
$105.00
400–600 amp
$155.00
600–800 amp
$205.00
800–1,000 amp
$255.00
3 Phase 208 or 240 Volt
tiered rates (see fee table), minimum $75.00
0–100 amp
$92.00
100–150 amp
$100.00
150–200 amp
$118.00
200–400 amp
$152.00
400–600 amp
$238.00
600–800 amp
$325.00
800–1,000 amp
$412.00
3 Phase 480 Volt
tiered rates (see fee table), minimum $75.00
0–100 amp
$144.00
100–150 amp
$160.00
150–200 amp
$196.00
200–400 amp
$264.00
400–600 amp
$436.00
600–800 amp
$610.00
800–1,000 amp
$784.00
State Building Code Administration Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
State DBPR Professional Regulation Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
Change in Contractor Fee (if applicable)
$175.00
Power Company Reconnection Permit Fee (if applicable)
$60.00
Re-Inspection Fee (if applicable)
$50.00
Temporary Electrical Service or E-TUG Fee (if applicable)
$35.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured Electrician in Lake Placid

Homeowners and contractors planning a project check Lake Placid electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Lake Placid Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
amp
60400 amp
Estimated electrical permit fee
$89.00
Electrical permit fee$85.00
tiered rates (see fee table), minimum $75.00
State Building Code Administration Surcharge (F.S. 553.721)$2.00
State DBPR Professional Regulation Surcharge (F.S. 468.631)$2.00
Total Estimate$89.00

Permit fees for Lake Placid are administered by Highlands County; the fees shown are the Highlands County schedule.

Estimate only. Confirm with the Highlands County building department before applying.

Sponsor This Page
Be the Featured Electrician in Lake Placid

Homeowners and contractors planning a project check Lake Placid electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Lake Placid Permit Fee FAQs

How Much Does a Building Permit Cost in Lake Placid?

The building permit for a $50,000 residential remodel runs $201.96, including the documented surcharges and minimum fees. The estimate is built from Lake Placid's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Lake Placid?

The roofing permit for a $20,000 residential re-roof runs $136.00, based on Lake Placid's sourced fee schedule.

How Are Permit Fees Calculated in Lake Placid?

A residential building permit is tiered rates (see fee table), minimum $75.00. Electrical permits are priced per amp; Plumbing permits are priced per fixture; Mechanical / HVAC and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Lake Placid?

The sourced schedule sets a minimum permit fee of $75.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Lake Placid?

On top of the base permit fee, the sourced schedule adds State Building Code Administration Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00) and State DBPR Professional Regulation Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Lake Placid?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Highlands County Schedule of Fees, Effective October 01, 2025 (FY 25-26), Building Division. See the official schedule. Last verified .

Other Jurisdictions in Highlands County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.