Plant City, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Plant City, straight from the official fee schedule, with a free permit fee calculator below.
In Plant City, a building permit for a $50,000 remodel runs $292.00 in permit fees, a $20,000 re-roof $159.25, a $10,000 HVAC change-out $43.50, a $10,000 electrical panel upgrade or rewire $109.00, and a whole-house repipe $134.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Plant City Building Division Residential/Commercial Fees (City Manager service-charge schedule under Code Sec. 78-102; official fee webpage, Document Center "Fee Schedule" seq 2.00)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Plant City permit portal, or call (813) 659-4254.
Last verified: October 14, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Plant City Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Roofing Permit Fees in Plant City
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Plant City roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PagePlant City Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
‡ Awaiting confirmation from the jurisdiction.
Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.
Estimate only. Confirm with the Plant City building department before applying. Apply online. Phone: (813) 659-4254. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Plant City roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Plant City
Plant City issues its own building, electrical, plumbing, mechanical, gas, and roofing permits through the City's MaintStar online permitting portal, where you create an account, submit the application, and upload plans and required documents. Once the permit is issued, you request and track required inspections in the same MaintStar portal. For help with the process, visit Development Services on the 2nd floor of City Hall at 302 W. Reynolds Street, or email bldgemail@plantcitygov.com. Some non-structural single-family work under $7,500 may be exempt; submit the City's exemption request form before starting.
Source: Plant City application instructions
Apply online: Plant City permit portal- Phone
- (813) 659-4254
- Address
- 302 W. Reynolds Street, 2nd Floor, Plant City, FL 33563
- Hours
- Monday to Friday, 8:00 AM to 4:30 PM
- Source
- Official contact page
Plant City Permit Fee FAQs
How Much Does a Building Permit Cost in Plant City?
How Much Does a Roofing Permit Cost in Plant City?
How Are Permit Fees Calculated in Plant City?
What Surcharges Are Added to Permits in Plant City?
Do I Need a Permit for a Small Residential Job in Plant City?
Where Do These Fees Come From?
Other Jurisdictions in Hillsborough County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.