FreeEvery fee straight from the official city and county fee schedules. No signup.

Indian River Shores, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Indian River Shores, straight from the official fee schedule, with a free permit fee calculator below.

In Indian River Shores, a building permit for a $50,000 remodel runs $514.29 in permit fees, a $20,000 re-roof $320.49, a $10,000 HVAC change-out $274.00, a $10,000 electrical panel upgrade or rewire $274.00, and a $10,000 whole-house repipe $274.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Town of Indian River Shores Resolution No. 26-05 - Building Department Permit Fees, Schedule "A" (adopted 2026-07-23; effective for permits issued on or after 2026-07-01)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $150.00.

How Indian River Shores values a job: Total job value is the value of the total improvement excluding land, including labor, overhead and profit, based on the greater of contract value or the ICC valuation table (or as otherwise acceptable to the Building Official for work not addressed by the ICC table).

Schedule effective July 1, 2026. Last verified: September 5, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Indian River Shores Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Indian River Shores

Flat permit fee
$150.00 flat, minimum $150.00
Building Inspection / Re-Inspection Fee (per required inspection)
$120.00 per inspection
State Mandated Surcharge (F.S. 553.721 + 468.631)
2.5% of the permit fee, minimum $4.00
Change of Contractor Fee (if applicable)
$75.00
Floodplain Regulatory Review (SFHA) (if applicable)
$40.00
Inspections Outside Regular Business Hours (if applicable)
$75.00 per hour, minimum $300.00 (Min Amount $300.00 = the printed $75.00/hr rate times the printed 4-hour minimum charge.)
NPDES - Stormwater, Erosion and Sedimentation Control (if applicable)
$150.00
Off-Site Drainage (new construction) (new construction) (if applicable)
$246.00
Pedestrian Walkway (new construction) (new construction) (if applicable)
$200.00
Plan Revision (if applicable)
$100.00
Sponsor This Page
Be the Featured Electrician in Indian River Shores

Homeowners and contractors planning a project check Indian River Shores electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Indian River Shores Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Indian River Shores are the same either way.

Estimated electrical permit fee
$274.00
Electrical permit fee$150.00
$150.00 flat, minimum $150.00
Building Inspection / Re-Inspection Fee (per required inspection)$120.00
Assumes 1 inspection; the building department sets the actual count for your project.
State Mandated Surcharge (F.S. 553.721 + 468.631)$4.00
Total Estimate$274.00

Estimate only. Confirm with the Indian River Shores building department before applying.

Sponsor This Page
Be the Featured Electrician in Indian River Shores

Homeowners and contractors planning a project check Indian River Shores electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Indian River Shores Permit Fee FAQs

How Much Does a Building Permit Cost in Indian River Shores?

The building permit for a $50,000 residential remodel runs $514.29, including the documented surcharges and minimum fees. The estimate is built from Indian River Shores's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Indian River Shores?

The roofing permit for a $20,000 residential re-roof runs $320.49, based on Indian River Shores's sourced fee schedule.

How Are Permit Fees Calculated in Indian River Shores?

A residential building permit is tiered rates (see fee table), minimum $150.00. Electrical, Plumbing, and Mechanical / HVAC permits are flat fees; Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Indian River Shores?

The sourced schedule sets a minimum permit fee of $150.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Indian River Shores?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (30% of the permit fee, minimum $120.00) and State Mandated Surcharge (F.S. 553.721 + 468.631) (2.5% of the permit fee, minimum $4.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Indian River Shores?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Indian River Shores Resolution No. 26-05 - Building Department Permit Fees, Schedule "A" (adopted 2026-07-23; effective for permits issued on or after 2026-07-01). See the official schedule. Last verified .

Other Jurisdictions in Indian River County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

FellsmereIndian River ShoresOrchidSebastian

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.