Greenwood, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Greenwood, straight from the official fee schedule, with a free permit fee calculator below.
Jackson County Building Services issues, inspects and charges building permits inside the Town of Greenwood, whose own land development code names Jackson County's building official as the permit authority, so the county's fee schedule applies here. Jackson County's development order fee ($50 per new residential site; 5 cents per square foot of impervious area, $250 minimum, for new commercial development) appears in new-construction estimates, but it likely does not apply here: the county's permit checklists say projects inside town limits get their development order from the town instead. The Town's land development code lets it charge its own development review fee, but no fee schedule is published, so it is not included here. See the Jackson County fee schedule
In Greenwood, a building permit for a $50,000 remodel runs $448.95 in permit fees, a re-roof $65.00, and a $10,000 electrical panel upgrade or rewire $115.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorBuilding Department Fee Schedule, Effective April 4, 2016 (Jackson County Building Services, fee-scheduletagged.pdf)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Jackson County Building Services issues, inspects and charges building permits inside the Town of Greenwood, whose own land development code names Jackson County's building official as the permit authority, so the county's fee schedule applies here. Jackson County's development order fee ($50 per new residential site; 5 cents per square foot of impervious area, $250 minimum, for new commercial development) appears in new-construction estimates, but it likely does not apply here: the county's permit checklists say projects inside town limits get their development order from the town instead. The Town's land development code lets it charge its own development review fee, but no fee schedule is published, so it is not included here. See the Jackson County fee schedule
Apply online at the Greenwood permit portal, or call 850-482-9805.
How Greenwood values a job: Chargeable valuation may be determined by group and type of construction using Appendix B and the Building Valuation Data Table (Schedule B), at 70% of the calculated values. For commercial work, when the contractor's cost and the valuation table conflict, the permit is based on the higher of the two.
Schedule effective April 4, 2016. Last verified: September 28, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Greenwood Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Greenwood
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Greenwood building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageGreenwood Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
3 documented rates for this permit type; pick the one that matches your job.
Chargeable valuation may be determined by group and type of construction using Appendix B and the Building Valuation Data Table (Schedule B), at 70% of the calculated values. For commercial work, when the contractor's cost and the valuation table conflict, the permit is based on the higher of the two.
Permit fees for Greenwood are administered by Jackson County; the fees shown are the Jackson County schedule.
Estimate only. Confirm with the Jackson County building department before applying. Apply online. Phone: 850-482-9805. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Greenwood building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Greenwood
The Town of Greenwood has no building department, so Jackson County Building Services issues and inspects building permits inside the town limits at the county's fees. For new construction or other development, first get a development order from Greenwood Town Hall (4207 Bryan Street, 850-594-1216) using the Town's Application for Developmental Approval. Then apply online through the county's iWorQ Citizen Portal, or turn in the county's Permit Application for All Trades at 4979 Healthy Way, Suite B, Marianna. Request inspections from your permit's page on the iWorQ portal or by calling 850-482-9805 by 2:30 PM for next-day service.
Source: Greenwood application instructions
Apply online: Greenwood permit portal- Phone
- 850-482-9805
- Address
- 4979 Healthy Way, Suite B, Marianna, FL 32446 (Jackson County Building Services, the administrator)
- Town Hall (development orders)
- 4207 Bryan Street, Greenwood, FL 32443, 850-594-1216, townhall@townofgreenwoodfl.org
- Source
- Official contact page
Greenwood Permit Fee FAQs
How Much Does a Building Permit Cost in Greenwood?
How Much Does a Roofing Permit Cost in Greenwood?
How Are Permit Fees Calculated in Greenwood?
What Surcharges Are Added to Permits in Greenwood?
Do I Need a Permit for a Small Residential Job in Greenwood?
Where Do These Fees Come From?
Other Jurisdictions in Jackson County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.