Fanning Springs, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Fanning Springs, straight from the official fee schedule, with a free permit fee calculator below.
In Fanning Springs, a building permit for a remodel runs $254.00 in permit fees, a $20,000 re-roof $129.00, an HVAC change-out $104.00, and an electrical panel upgrade or rewire $104.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area, one system, and 200 A service. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCommunity Development - Building Fees (Copy-of-FS-Schedule-Fees.pdf)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Fanning Springs permit portal, or call (352) 463-2855.
Last verified: September 26, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Fanning Springs Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Fanning Springs
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Fanning Springs building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageFanning Springs Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
3 documented rates for this permit type; pick the one that matches your job.
‡ Awaiting confirmation from the jurisdiction.
Estimate only. Confirm with the Fanning Springs building department before applying. Apply online. Phone: (352) 463-2855. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Fanning Springs building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Fanning Springs
The City of Fanning Springs runs its own Building Department and takes permit applications online through the iWorQ Citizen Portal, linked from the city's Building Department page. Choose the application you need (Residential Permit, Mobile Home Permit, Zoning Permit, or Division 2 Contractors for electrical, plumbing, mechanical, gas and fuel, fire, and roofing sub-permits), search for the property and contractor, complete the form, upload the site plan, floor plan and any other documents, sign, and submit. A Zoning Permit may be needed before a building or mobile home permit can be approved, and jobs over $5,000 need a Notice of Commencement. Inspections are requested from the portal's permit search using the Request An Inspection column. For questions, contact the Building Official at City Hall.
Source: Fanning Springs application instructions
Apply online: Fanning Springs permit portal- Building Official
- Leon Wright
- Phone
- (352) 463-2855 (mobile (352) 440-2034)
- fsbdpermit@gmail.com
- Address
- 17651 NW 90th Court, Fanning Springs, FL 32693
- Hours
- not published
- Source
- Official contact page
Fanning Springs Permit Fee FAQs
How Much Does a Building Permit Cost in Fanning Springs?
How Much Does a Roofing Permit Cost in Fanning Springs?
How Are Permit Fees Calculated in Fanning Springs?
What Surcharges Are Added to Permits in Fanning Springs?
Do I Need a Permit for a Small Residential Job in Fanning Springs?
Where Do These Fees Come From?
Other Jurisdictions in Levy County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.