FreeEvery fee straight from the official city and county fee schedules. No signup.

Bradenton Beach, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Bradenton Beach, straight from the official fee schedule, with a free permit fee calculator below.

In Bradenton Beach, a building permit for a $50,000 remodel runs $1,640.00 in permit fees, a $20,000 re-roof $717.50, a $10,000 HVAC change-out $410.00, a $10,000 electrical panel upgrade or rewire $410.00, and a $10,000 whole-house repipe $410.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Resolution No. 25-988 – Consolidated Fee Schedule Attachment A (Building Permits, Inspections, Development and Code Enforcement), City of Bradenton Beach

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Bradenton Beach permit portal, or call (941) 778-1005.

How Bradenton Beach values a job: Permit valuation is based on the signed owner/contractor proposal or contract price submitted at the time of application; the valuation is rounded up to the nearest $1,000 for fee calculation.

Schedule effective October 2, 2025. Last verified: September 25, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Bradenton Beach Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Bradenton Beach

All projects
$100.00 base, plus $30.00 per $1,000 of job value or fraction thereof
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee plus designated fees, minimum $2.00†
On commercial building permits computed on the permit fee plus the plan review fee, per the city's invoices (the printed 2.5% applies to the fees for Florida Building Code compliance)
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee plus designated fees, minimum $2.00†
On commercial building permits computed on the permit fee plus the plan review fee, per the city's invoices (the printed 2.5% applies to the fees for Florida Building Code compliance)
Certificate of Completion (if applicable)
$70.00
Certificate of Occupancy (if applicable)
$135.00
Detailed Plan Review Fee (if applicable)
15% of the permit fee‡
Extend Temporary Certificate of Occupancy (if applicable)
$540.00
Re-Inspection Fee (if applicable)
$75.00‡
Temporary Certificate of Occupancy (Commercial) (if applicable)
$340.00
Temporary Pre-power Service Release (if applicable)
$135.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Roofer in Bradenton Beach

Homeowners and contractors planning a project check Bradenton Beach roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Bradenton Beach Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
$
$500$100,000
Estimated roofing permit fee
$717.50
Included in this total
Roofing Permit Fee$700.00
$100.00 base + 20 × $30.00 per $1,000
State Building Code Administrators Surcharge (F.S. 468.631)$10.50
State Building Permit Surcharge (F.S. 553.721)$7.00
Total Estimate$717.50

This fee rate is higher than in most Florida jurisdictions; it matches Bradenton Beach's official schedule as published.

Permit valuation is based on the signed owner/contractor proposal or contract price submitted at the time of application; the valuation is rounded up to the nearest $1,000 for fee calculation.

Estimate only. Confirm with the Bradenton Beach building department before applying. Apply online. Phone: (941) 778-1005. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Roofer in Bradenton Beach

Homeowners and contractors planning a project check Bradenton Beach roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Bradenton Beach

Bradenton Beach issues its own permits through its Building and Planning Department, and all permit applications can be submitted online through the city's CitizenServe portal. Upload the signed contract or proposal with the application, since the fee is based on that job value. Schedule inspections by logging into your CitizenServe account before 2 pm for next-day service; inspections are typically done between 10 am and 1 pm. For questions, call the department at (941) 778-1005 ext. 210 or visit City Hall at 107 Gulf Drive N.

Source: Bradenton Beach application instructions

Apply online: Bradenton Beach permit portal
Building Department Contact
Phone
(941) 778-1005 ext. 210
Address
107 Gulf Drive N, Bradenton Beach, FL 34217
Hours
Inspections typically 10 am to 1 pm; request by 2 pm for next-day inspection

Bradenton Beach Permit Fee FAQs

How Much Does a Building Permit Cost in Bradenton Beach?

The building permit for a $50,000 residential remodel runs $1,640.00, including the documented surcharges and minimum fees. The estimate is built from Bradenton Beach's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Bradenton Beach?

The roofing permit for a $20,000 residential re-roof runs $717.50, based on Bradenton Beach's sourced fee schedule.

How Are Permit Fees Calculated in Bradenton Beach?

A residential building permit is $100.00 base, plus $30.00 per $1,000 of job value or fraction thereof. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Bradenton Beach?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (Commercial) (15% of the permit fee), State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee plus designated fees, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee plus designated fees, minimum $2.00). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Do I Need a Permit for a Small Residential Job in Bradenton Beach?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Resolution No. 25-988 – Consolidated Fee Schedule Attachment A (Building Permits, Inspections, Development and Code Enforcement), City of Bradenton Beach. See the official schedule. Last verified .

Other Jurisdictions in Manatee County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.