FreeEvery fee straight from the official city and county fee schedules. No signup.

Building Permit Fees in Bradenton, FL (2026)

In Bradenton, a building permit for a $50,000 remodel runs $369.00 in permit fees, a $20,000 re-roof $246.00, a $10,000 HVAC change-out $124.00, a $10,000 electrical panel upgrade or rewire $124.00, and a $10,000 whole-house repipe $124.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

City of Bradenton Fee Schedule 2026, Exhibit to Resolution No. 26-50 (adopted 6/10/2026, effective 7/1/2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Schedule effective July 1, 2026. Last verified: August 26, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Bradenton Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Mechanical / HVAC Permit Fees in Bradenton

Residential (1–2 family)
$120.00 flat
Residential (1–2 family): As Subcontractor
$100.00 flat
Commercial / 3+ units
$150.00 flat
Commercial / 3+ units: As Subcontractor
$100.00 flat
Electrical/Plumbing Board Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
FL Building Code Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured HVAC Company in Bradenton

Homeowners and contractors planning a project check Bradenton mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Bradenton Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
Estimated mechanical / HVAC permit fee
$124.00
Mechanical / HVAC permit fee$120.00
$120.00 flat
Electrical/Plumbing Board Surcharge (F.S. 468.631)$2.00
FL Building Code Surcharge (F.S. 553.721)$2.00
Total Estimate$124.00

Estimate only. Confirm with the Bradenton building department before applying.

Sponsor This Page
Be the Featured HVAC Company in Bradenton

Homeowners and contractors planning a project check Bradenton mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Bradenton Permit Fee FAQs

How Much Is a Building Permit in Bradenton?

The building permit for a $50,000 residential remodel runs $369.00, assuming a 200 sq ft remodel area where the schedule prices per unit, including the documented surcharges and minimum fees. The estimate is built from Bradenton's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Is a Roofing Permit in Bradenton?

The roofing permit for a $20,000 residential re-roof runs $246.00, based on Bradenton's sourced fee schedule.

How Are Permit Fees Calculated in Bradenton?

A residential building permit is tiered rates (see fee table) (Over-600 sq ft tier stores Band Base Fee = $0.92 × 600 = $552.00 so the tier reproduces the source's whole-structure per-sq-ft rate (not a marginal add-on to the under-600 flat fee) for structures over 600 sq ft.). Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Bradenton?

On top of the base permit fee, the sourced schedule adds Electrical/Plumbing Board Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and FL Building Code Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Bradenton?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Bradenton Fee Schedule 2026, Exhibit to Resolution No. 26-50 (adopted 6/10/2026, effective 7/1/2026). See the official schedule. Last verified .

Compare Permit Fees Across Manatee County

The same job, priced by each jurisdiction's own fee schedule. Across Manatee County's 7 covered jurisdictions, a building permit for a $50,000 remodel runs from $307.50 (Unincorporated Manatee County) to $1,640.00 (Bradenton Beach).

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Manatee County$307.50$157.00
Anna Maria$1,442.00$489.25
Bradenton$369.00$246.00
Bradenton Beach$1,640.00$717.50
Holmes Beach$1,250.00$545.00
Longboat Key$537.10$317.75
Palmetto$809.58$376.98

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area and a 2,000 sq ft (20-square) roof. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.