FreeEvery fee straight from the official city and county fee schedules. No signup.

Building Permit Fees in Dunnellon, FL (2026)

In Dunnellon, a building permit for a $50,000 remodel runs $768.75 in permit fees, a $20,000 re-roof $225.50, a $10,000 HVAC change-out $154.25, a $10,000 electrical panel upgrade or rewire $154.25, and a $10,000 whole-house repipe $154.25. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Resolution #RES2022-09 – Amended Permit Fees (Schedule 'A' Building Fee Schedule)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

How Dunnellon values a job: Fees are charged on the construction or contract cost of the work. Estimates shown here exclude the City's separate Administration Fee, which the City applies to nearly all permits ($50 for permits of $120 to $200, or $50 plus 2% of the permit fee for permits over $200).

Schedule effective October 10, 2022. Last verified: September 3, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Dunnellon Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Dunnellon

Residential (1–2 family)
1.5% of job value, minimum $120.00
Commercial / 3+ units
1.75% of job value, minimum $120.00
FL BCAIB Education Surcharge (FS 468.631)
1.5% of the permit fee, minimum $2.00
FL Building Code Surcharge (FS 553.721)
1% of the permit fee, minimum $2.00
After-the-Fact Permit Surcharge (if applicable)
100% of the permit fee
Certification of Additional Plans (if applicable)
$75.00
Change of Contractor (if applicable)
$50.00
Permit Extension Fee (if applicable)
$50.00
Plan Review (First 2 Hours) (if applicable)
$75.00
Re-inspection Fee (1st) (if applicable)
$50.00
Replacement Permit Inspection Card (if applicable)
$25.00
Revision to Approved Plans (Base) (if applicable)
$75.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Dunnellon

Homeowners and contractors planning a project check Dunnellon electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Dunnellon Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Dunnellon are the same either way.

$
$500$100,000
Estimated electrical permit fee
$154.25
Electrical permit fee$150.00
1.5% of job value, minimum $120.00
FL BCAIB Education Surcharge (FS 468.631)$2.25
FL Building Code Surcharge (FS 553.721)$2.00
Total Estimate$154.25

Fees are charged on the construction or contract cost of the work. Estimates shown here exclude the City's separate Administration Fee, which the City applies to nearly all permits ($50 for permits of $120 to $200, or $50 plus 2% of the permit fee for permits over $200).

Estimate only. Confirm with the Dunnellon building department before applying.

Sponsor This Page
Be the Featured Electrician in Dunnellon

Homeowners and contractors planning a project check Dunnellon electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Dunnellon Permit Fee FAQs

How Much Is a Building Permit in Dunnellon?

The building permit for a $50,000 residential remodel runs $768.75, including the documented surcharges and minimum fees. The estimate is built from Dunnellon's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Is a Roofing Permit in Dunnellon?

The roofing permit for a $20,000 residential re-roof runs $225.50, based on Dunnellon's sourced fee schedule.

How Are Permit Fees Calculated in Dunnellon?

A residential building permit is 1.5% of job value, minimum $120.00. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Dunnellon?

On top of the base permit fee, the sourced schedule adds FL BCAIB Education Surcharge (FS 468.631) (1.5% of the permit fee, minimum $2.00) and FL Building Code Surcharge (FS 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Dunnellon?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from Resolution #RES2022-09 – Amended Permit Fees (Schedule 'A' Building Fee Schedule). See the official schedule. Last verified .

Compare Permit Fees Across Marion County

The same job, priced by each jurisdiction's own fee schedule. Across Marion County's 5 covered jurisdictions, a building permit for a $50,000 remodel runs from $166.43 (Belleview) to $768.75 (Dunnellon).

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Marion County$183.69n/a
Belleview$166.43$144.10
Dunnellon$768.75$225.50
McIntosh$183.69n/a
Ocala$179.63$104.00

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area and a 2,000 sq ft roof. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.