FreeEvery fee straight from the official city and county fee schedules. No signup.

Reddick, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Reddick, straight from the official fee schedule, with a free permit fee calculator below.

Marion County Building Safety issues, inspects, and collects the fees for building permits inside the Town of Reddick on the County's own schedule (Resolution 25-R-295), as the County's permit records for in-town parcels show; the Town has no building department. The County may first ask for a letter from the Town confirming zoning. Estimates for new buildings, manufactured and modular homes, accessory structures, sheds, metal buildings and pools include Marion County's $55 site plan review, which the County billed on a 2025 new home permit in town but not on a 2026 accessory building permit. A use that needs a Town special use permit also pays the Town's $25 application fee, which is not included in these estimates. See the Marion County fee schedule

A note on these figures from the official schedule. Details

Marion County (which administers Reddick's building permits) is applying a temporary 50% reduction to its square-footage building permit fees for applications from October 1, 2025 through September 30, 2027 (Resolution 25-R-295). The fees shown reflect that discount. Starting October 1, 2027, the adopted rates change again, including several flat residential trade fees. See the official notice

In Reddick, a building permit for a remodel runs $183.69 in permit fees, a $10,000 HVAC change-out $104.00, a $10,000 electrical panel upgrade or rewire $104.00, and a $10,000 whole-house repipe $104.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Resolution 25-R-295 (Marion County, FL Building Permit Fee Schedule, eff. 2025-10-01)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Marion County Building Safety issues, inspects, and collects the fees for building permits inside the Town of Reddick on the County's own schedule (Resolution 25-R-295), as the County's permit records for in-town parcels show; the Town has no building department. The County may first ask for a letter from the Town confirming zoning. Estimates for new buildings, manufactured and modular homes, accessory structures, sheds, metal buildings and pools include Marion County's $55 site plan review, which the County billed on a 2025 new home permit in town but not on a 2026 accessory building permit. A use that needs a Town special use permit also pays the Town's $25 application fee, which is not included in these estimates. See the Marion County fee schedule

Apply online at the Reddick permit portal, or call 352-438-2400.

How Reddick values a job: Marion County prices new construction, additions, and accessory structures by total square footage under roof plus a base fee, not by job value; trade permits are flat fees.

Schedule effective October 1, 2025. Last verified: September 29, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Reddick Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Reddick

Residential (1–2 family)
$100.00 flat
Commercial / 3+ units
$125.00 flat
Commercial / 3+ units: Mobile Home/RV Park Electrical (per site)
$125.00 base, plus $5.00 per site
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Marion County Unincorporated - Preliminary Plans Review (Commercial, per Trade) (if applicable)
$75.00†

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured Electrician in Reddick

Homeowners and contractors planning a project check Reddick electrical permit fees here first.

One sponsor per trade, $39 a month, month to month.

Reddick Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Estimated electrical permit fee
$104.00
Included in this total
Electrical Permit Fee$100.00
$100.00 flat
State Building Code Administrators Surcharge (F.S. 468.631)$2.00
State Building Permit Surcharge (F.S. 553.721)$2.00
Total Estimate$104.00
A note on these figures from the official schedule. Details

Marion County (which administers Reddick's building permits) is applying a temporary 50% reduction to its square-footage building permit fees for applications from October 1, 2025 through September 30, 2027 (Resolution 25-R-295). The fees shown reflect that discount. Starting October 1, 2027, the adopted rates change again, including several flat residential trade fees. See the official notice

Permit fees for Reddick are administered by Marion County; the fees shown are the Marion County schedule.

Estimate only. Confirm with the Marion County building department before applying. Apply online. Phone: 352-438-2400. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Reddick

Homeowners and contractors planning a project check Reddick electrical permit fees here first.

One sponsor per trade, $39 a month, month to month.

How to Apply for a Permit in Reddick

Apply for the building permit with Marion County Building Safety through Civic Access, the county's online permitting portal, or in person in Ocala; the Town of Reddick does not issue building permits. For a property inside town limits, Marion County may first ask for a letter from the Town of Reddick confirming the property's zoning; contact the Town Clerk at (352) 591-4095 (Tuesday to Thursday). If your project needs a special use permit under the Town's zoning ordinance, file that application with the Town Clerk first ($25 application fee). Marion County reviews plans, collects permit fees, and schedules inspections through Civic Access.

Source: Reddick application instructions

Apply online: Reddick permit portal
Building Department Contact
Address
2710 E. Silver Springs Blvd., Ocala, FL 34470
Hours
Monday to Thursday 7 a.m. to 4 p.m.; Friday 8:45 a.m. to 4 p.m.
Sponsor This Spot · Permit Help
Be the Featured Permit Expediter in Marion County

Your name, phone and website right here, next to the building department's contact info, where people look right before they apply.

One expediter per county.

Reddick Permit Fee FAQs

How Much Does a Building Permit Cost in Reddick?

The building permit for a residential remodel runs $183.69, assuming a 200 sq ft remodel area (the schedule prices per unit), including the documented surcharges and minimum fees. The estimate is built from Reddick's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Are Permit Fees Calculated in Reddick?

A residential building permit is $150.00 base, plus $0.145 per square foot. Electrical, Plumbing, and Mechanical / HVAC permits are flat fees; Roofing permits are priced per unit. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Reddick?

On top of the base permit fee, the sourced schedule adds State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Reddick?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Resolution 25-R-295 (Marion County, FL Building Permit Fee Schedule, eff. 2025-10-01). See the official schedule. Last verified .

Other Jurisdictions in Marion County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.