Key Colony Beach, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Key Colony Beach, straight from the official fee schedule, with a free permit fee calculator below.
In Key Colony Beach, a building permit for a $50,000 remodel runs $1,824.50 in permit fees, a $20,000 re-roof $748.25, a $10,000 HVAC change-out $389.50, a $10,000 electrical panel upgrade or rewire $389.50, and a $10,000 whole-house repipe $389.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorKey Colony Beach Resolution No. 2026-01 (Building Department Permit Fee Schedule, amending Res. 2024-13); Resolution No. 2022-02 (Solar Permitting Fee)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Key Colony Beach values a job: Fees are charged on the job cost; for new buildings, job cost excludes open or enclosed garages, open or screened porches, carports and similar construction, and any non-habitable floor area. The schedule prints electrical, plumbing and mechanical fees only for additions and alterations; new-construction trade work has no separate printed fee.
Schedules effective February 24, 2022 – February 19, 2026. Last verified: September 28, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Key Colony Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Key Colony Beach
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Key Colony Beach building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageKey Colony Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works
This fee rate is higher than in most Florida jurisdictions; it matches Key Colony Beach's official schedule as published.
Fees are charged on the job cost; for new buildings, job cost excludes open or enclosed garages, open or screened porches, carports and similar construction, and any non-habitable floor area. The schedule prints electrical, plumbing and mechanical fees only for additions and alterations; new-construction trade work has no separate printed fee.
Estimate only. Confirm with the Key Colony Beach building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Key Colony Beach building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageKey Colony Beach Permit Fee FAQs
How Much Does a Building Permit Cost in Key Colony Beach?
How Much Does a Roofing Permit Cost in Key Colony Beach?
How Are Permit Fees Calculated in Key Colony Beach?
What Surcharges Are Added to Permits in Key Colony Beach?
Do I Need a Permit for a Small Residential Job in Key Colony Beach?
Where Do These Fees Come From?
Other Jurisdictions in Monroe County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.