Key Colony Beach, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Key Colony Beach, straight from the official fee schedule, with a free permit fee calculator below.

In Key Colony Beach, a building permit for a $50,000 remodel runs $1,824.50 in permit fees, a $20,000 re-roof $748.25, a $10,000 HVAC change-out $389.50, a $10,000 electrical panel upgrade or rewire $389.50, and a $10,000 whole-house repipe $389.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Key Colony Beach Resolution No. 2026-01 (Building Department Permit Fee Schedule, amending Res. 2024-13); Resolution No. 2022-02 (Solar Permitting Fee)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

How Key Colony Beach values a job: Fees are charged on the job cost; for new buildings, job cost excludes open or enclosed garages, open or screened porches, carports and similar construction, and any non-habitable floor area. The schedule prints electrical, plumbing and mechanical fees only for additions and alterations; new-construction trade work has no separate printed fee.

Schedules effective February 24, 2022 – February 19, 2026. Last verified: September 28, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Key Colony Beach Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Key Colony Beach

All projects
$100.00 for the first $2,500, plus $35.00 per additional $1,000 of job value or fraction thereof
Solar panel installation
$500.00 flat‡
State Building Permit Surcharges (F.S. 553.721 + 468.631, combined)
2.5% of the permit fee, minimum $4.00
Private Provider Inspections Discount (select fee rules only)
may reduce the permit fee by 10%

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Key Colony Beach

Homeowners and contractors planning a project check Key Colony Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Key Colony Beach Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

2 documented rates for this permit type; pick the one that matches your job.

Using a private provider?

Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works

$
$500$100,000
Estimated electrical permit fee
$389.50
Included in this total
Electrical Permit Fee$380.00
$100.00 for the first $2,500 + 8 × $35.00 per additional $1,000
State Building Permit Surcharges (F.S. 553.721 + 468.631, Combined)$9.50
Total Estimate$389.50

Fees are charged on the job cost; for new buildings, job cost excludes open or enclosed garages, open or screened porches, carports and similar construction, and any non-habitable floor area. The schedule prints electrical, plumbing and mechanical fees only for additions and alterations; new-construction trade work has no separate printed fee.

Estimate only. Confirm with the Key Colony Beach building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Key Colony Beach

Homeowners and contractors planning a project check Key Colony Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Key Colony Beach Permit Fee FAQs

How Much Does a Building Permit Cost in Key Colony Beach?

The building permit for a $50,000 residential remodel runs $1,824.50, including the documented surcharges and minimum fees. The estimate is built from Key Colony Beach's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Key Colony Beach?

The roofing permit for a $20,000 residential re-roof runs $748.25, based on Key Colony Beach's sourced fee schedule.

How Are Permit Fees Calculated in Key Colony Beach?

A residential building permit is $100.00 for the first $2,500, plus $35.00 per additional $1,000 of job value or fraction thereof. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Key Colony Beach?

On top of the base permit fee, the sourced schedule adds State Building Permit Surcharges (F.S. 553.721 + 468.631, combined) (2.5% of the permit fee, minimum $4.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Key Colony Beach?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Key Colony Beach Resolution No. 2026-01 (Building Department Permit Fee Schedule, amending Res. 2024-13); Resolution No. 2022-02 (Solar Permitting Fee). See the official schedule. Last verified .

Other Jurisdictions in Monroe County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

IslamoradaKey Colony BeachKey WestLayton

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.