Key Colony Beach, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Key Colony Beach, straight from the official fee schedule, with a free permit fee calculator below.
In Key Colony Beach, a building permit for a $50,000 remodel runs $1,824.50 in permit fees, a $20,000 re-roof $748.25, a $10,000 HVAC change-out $389.50, a $10,000 electrical panel upgrade or rewire $389.50, and a $10,000 whole-house repipe $389.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorKey Colony Beach Resolution No. 2026-01 (Building Department Permit Fee Schedule, amending Res. 2024-13); Resolution No. 2022-02 (Solar Permitting Fee)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Key Colony Beach values a job: Fees are charged on the job cost; for new buildings, job cost excludes open or enclosed garages, open or screened porches, carports and similar construction, and any non-habitable floor area. The schedule prints electrical, plumbing and mechanical fees only for additions and alterations; new-construction trade work has no separate printed fee.
Schedules effective February 24, 2022 – February 19, 2026. Last verified: September 28, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Key Colony Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Mechanical / HVAC Permit Fees in Key Colony Beach
Homeowners and contractors planning a project check Key Colony Beach mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageKey Colony Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works
Fees are charged on the job cost; for new buildings, job cost excludes open or enclosed garages, open or screened porches, carports and similar construction, and any non-habitable floor area. The schedule prints electrical, plumbing and mechanical fees only for additions and alterations; new-construction trade work has no separate printed fee.
Estimate only. Confirm with the Key Colony Beach building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Key Colony Beach mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageKey Colony Beach Permit Fee FAQs
How Much Does a Building Permit Cost in Key Colony Beach?
How Much Does a Roofing Permit Cost in Key Colony Beach?
How Are Permit Fees Calculated in Key Colony Beach?
What Surcharges Are Added to Permits in Key Colony Beach?
Do I Need a Permit for a Small Residential Job in Key Colony Beach?
Where Do These Fees Come From?
Other Jurisdictions in Monroe County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.