Building Permit Fees in Crestview, FL (2026)
Through September 30, 2026 the City's posted permit fee worksheets reflect a 20 percent reduction to building permit fees (Resolution 2020-13 and Ordinance 1949). The figures shown here are the adopted schedule rates; Ordinance 2035, scheduled for adoption September 14, 2026, removes the reduction effective October 1, 2026. Confirm the amount due with the Building Division at 850-682-1560, option 6. See the official notice
In Crestview, a building permit for a $50,000 remodel runs $399.13 in permit fees, a $20,000 re-roof $189.00, a $10,000 HVAC change-out $133.75, a $10,000 electrical panel upgrade or rewire $182.50, and a $10,000 whole-house repipe $146.50. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume 10 altered circuits and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
City of Crestview Comprehensive Fee Schedule, Fiscal Year 2025-2026 (Effective 10/1/2025, Amended 6/22/2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Crestview values a job: Fees are charged on the total valuation of the work as stated on the application; the Building Official may withhold a permit that appears undervalued and may require detailed cost estimates or a copy of the construction contract.
Schedule effective October 1, 2025. Last verified: September 3, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Crestview Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Roofing Permit Fees in Crestview
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Crestview roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageCrestview Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees are charged on the total valuation of the work as stated on the application; the Building Official may withhold a permit that appears undervalued and may require detailed cost estimates or a copy of the construction contract.
Through September 30, 2026 the City's posted permit fee worksheets reflect a 20 percent reduction to building permit fees (Resolution 2020-13 and Ordinance 1949). The figures shown here are the adopted schedule rates; Ordinance 2035, scheduled for adoption September 14, 2026, removes the reduction effective October 1, 2026. Confirm the amount due with the Building Division at 850-682-1560, option 6. See the official notice
Estimate only. Confirm with the Crestview building department before applying.
Homeowners and contractors planning a project check Crestview roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageCrestview Permit Fee FAQs
How Much Is a Building Permit in Crestview?
How Much Is a Roofing Permit in Crestview?
How Are Permit Fees Calculated in Crestview?
What Surcharges Are Added to Permits in Crestview?
Do I Need a Permit for a Small Residential Job in Crestview?
Where Do These Fees Come From?
Compare Permit Fees Across Okaloosa County
The same job, priced by each jurisdiction's own fee schedule. Across Okaloosa County's 8 covered jurisdictions, a building permit for a $50,000 remodel runs from $333.38 (Unincorporated Okaloosa County) to $783.88 (Destin).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Unincorporated Okaloosa County | $333.38 | $194.00 |
| Cinco Bayou | $333.38 | $194.00 |
| Crestview | $399.13 | $189.00 |
| Destin | $783.88 | $441.25 |
| Fort Walton Beach | $580.16 | $196.37 |
| Laurel Hill | $333.38 | $194.00 |
| Mary Esther | $357.63 | $196.71 |
| Shalimar | $333.38 | $194.00 |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.