Destin, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Destin, straight from the official fee schedule, with a free permit fee calculator below.
In Destin, a building permit for a $50,000 remodel runs $783.88 in permit fees, a $20,000 re-roof $441.25, a $10,000 HVAC change-out $223.50, a $10,000 electrical panel upgrade or rewire $223.50, and a $10,000 whole-house repipe $223.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorResolution 26-25, Amended and Restated Schedule of Fees, Attachment A (Clean), adopted September 21, 2026 (September 21, 2026 City Council agenda packet, item 5.E)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Destin permit portal, or call (850) 654-1119.
How Destin values a job: Destin charges building alteration, roofing, electrical, mechanical and plumbing permits on the cost valuation of the work declared on the application: $5 under $15,000, then a rate per $1,000 or fraction thereof on the whole value. New heated and cooled buildings and additions are priced by gross floor area instead.
Schedule effective September 21, 2026. Last verified: October 9, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Destin Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Destin
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Destin building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageDestin Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
2 documented rates for this permit type; pick the one that matches your job.
‡ Awaiting confirmation from the jurisdiction.
Destin charges building alteration, roofing, electrical, mechanical and plumbing permits on the cost valuation of the work declared on the application: $5 under $15,000, then a rate per $1,000 or fraction thereof on the whole value. New heated and cooled buildings and additions are priced by gross floor area instead.
Estimate only. Confirm with the Destin building department before applying. Apply online. Phone: (850) 654-1119. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Destin building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Destin
Destin takes all permit applications online through My Government Online (MGO). Create an MGO account (an existing MGO login works if you pick Destin as the jurisdiction), choose the application that matches your project, and upload your plans and documents there. Fees are paid before the permit is issued. Every permit needs inspections: request them through MGO, and qualified requests made during business hours are scheduled for the next business day. For questions, call the Building Division at (850) 654-1119, Option 2.
Source: Destin application instructions
Apply online: Destin permit portal- Phone
- (850) 654-1119 Option 2
- Address
- Destin City Hall Annex, 4100 Indian Bayou Trail, Destin, FL 32541
- Hours
- Monday to Friday 7:00 AM to 4:00 PM
- Source
- Official contact page
Destin Permit Fee FAQs
How Much Does a Building Permit Cost in Destin?
How Much Does a Roofing Permit Cost in Destin?
How Are Permit Fees Calculated in Destin?
What Surcharges Are Added to Permits in Destin?
Do I Need a Permit for a Small Residential Job in Destin?
Where Do These Fees Come From?
Other Jurisdictions in Okaloosa County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.