Niceville, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Niceville, straight from the official fee schedule, with a free permit fee calculator below.
In Niceville, a building permit for a $50,000 remodel runs $359.53 in permit fees, a $20,000 re-roof $191.50, a $10,000 HVAC change-out $142.75, a $10,000 electrical panel upgrade or rewire $142.75, and a $10,000 whole-house repipe $142.75. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee Calculator[1] City of Niceville Community Development Fee Schedule, adopted via Resolution 26-08-01, effective 9/1/2026; [2] City of Niceville Comprehensive Fee Schedule (Ord. 25-08-01, Aug 12, 2025 council packet), Fire Department review fees
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Niceville values a job: Niceville bases permit fees on the value of the work, including labor, materials, design, and site work directly associated with the permitted work.
Schedule effective September 1, 2026. Last verified: September 27, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Niceville Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Roofing Permit Fees in Niceville
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Niceville roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageNiceville Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Niceville are the same either way.
‡ Awaiting confirmation from the jurisdiction.
Niceville bases permit fees on the value of the work, including labor, materials, design, and site work directly associated with the permitted work.
Estimate only. Confirm with the Niceville building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Niceville roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageNiceville Permit Fee FAQs
How Much Does a Building Permit Cost in Niceville?
How Much Does a Roofing Permit Cost in Niceville?
How Are Permit Fees Calculated in Niceville?
What Surcharges Are Added to Permits in Niceville?
Do I Need a Permit for a Small Residential Job in Niceville?
Where Do These Fees Come From?
Other Jurisdictions in Okaloosa County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.