Pasco County, FL Permit Fees (2026)
Building permit fees for unincorporated Pasco County, with a free permit fee calculator. Inside city limits? Pick your city below; incorporated cities have their own fee schedules.
In Unincorporated Pasco County, a building permit for a remodel runs $270.00 in permit fees, a $20,000 re-roof $99.00, an HVAC change-out $132.00, an electrical panel upgrade or rewire $132.00, and a whole-house repipe $134.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area and a 200 sq ft job area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorPasco County Board of County Commissioners Resolution (BCS 26-0249) - Schedule of Fees for Central Permitting and Building Inspections Divisions (amends Res. 18-17 in its entirety; adopted 7/14/2026, effective retroactively to 7/1/2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $45.00.
Apply online at the Unincorporated Pasco County permit portal, or call 727-847-8126.
How Unincorporated Pasco County values a job: Construction valuation is based on the value of materials and labor obtained through normal market transactions, or for exempted single-family work under F.S. 553.79(1)(g), on a signed contract or other documentation of the work's value.
Schedule effective July 1, 2026. Last verified: September 26, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Jurisdictions in Pasco County
Jobs inside city limits are permitted by the city, not the county. Across Pasco County's 7 covered jurisdictions, a building permit for a $50,000 remodel runs from $270.00 (Unincorporated Pasco County) to $1,582.50 (Port Richey).
Unincorporated Pasco County Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Unincorporated Pasco County
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Unincorporated Pasco County electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageUnincorporated Pasco County Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
‡ Awaiting confirmation from the jurisdiction.
Assumes a $10,000.00 total job value for valuation-based surcharges.
Estimate only. Confirm with the Unincorporated Pasco County building department before applying. Apply online. Phone: 727-847-8126. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Unincorporated Pasco County electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Unincorporated Pasco County
Apply and pay online through PascoGateway, the county's Accela permit portal. Permit technicians also help in person at Central Permitting offices in New Port Richey (8661 Citizens Drive, Suite 100) and Dade City (14236 6th Street, Suite 203), Monday through Friday, 8 a.m. to 4 p.m., and in Land O' Lakes by appointment. Schedule inspections in PascoGateway or by calling 727-847-8126, option 2. Air conditioning, water heater and water softener change-outs can use VuSpex virtual inspections. Questions go to BCSCustomerService@MyPasco.net or 727-847-8126, option 5.
Source: Unincorporated Pasco County application instructions
Apply online: Unincorporated Pasco County permit portal- Phone
- 727-847-8126 (option 5 permitting, option 2 inspections)
- Address
- 8661 Citizens Drive, Suite 100, New Port Richey, FL 34654
- Hours
- Monday-Friday, 8 a.m. to 4 p.m.
- Source
- Official contact page
Unincorporated Pasco County Permit Fee FAQs
How Much Does a Building Permit Cost in Unincorporated Pasco County?
How Much Does a Roofing Permit Cost in Unincorporated Pasco County?
How Are Permit Fees Calculated in Unincorporated Pasco County?
What Is the Minimum Permit Fee in Unincorporated Pasco County?
What Surcharges Are Added to Permits in Unincorporated Pasco County?
Do I Need a Permit for a Small Residential Job in Unincorporated Pasco County?
Where Do These Fees Come From?
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.