Milton, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Milton, straight from the official fee schedule, with a free permit fee calculator below.
Building permits within Milton city limits are issued by the Santa Rosa County Building Department, not the City of Milton, per the city's own Unified Development Code (Table 3.2.1, Summary of Approval Authority), so Milton's building permit fees follow Santa Rosa County's fee schedule. The City of Milton separately charges its own development review, plan review and stormwater review fees (Resolution 2025-19, Attachment E), which are not included in this estimate. See the Santa Rosa County fee schedule
In Milton, a building permit for a $50,000 remodel runs $265.92 in permit fees, a $20,000 re-roof $190.28, a $10,000 HVAC change-out $106.00, a $10,000 electrical panel upgrade or rewire $106.00, and a $10,000 whole-house repipe $139.50. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Santa Rosa County, FL - Resolution No. 2025-29 (Development Services Fee Schedule, OR BK 4657 Pg 1706-1710, adopted 9/11/2025)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Building permits within Milton city limits are issued by the Santa Rosa County Building Department, not the City of Milton, per the city's own Unified Development Code (Table 3.2.1, Summary of Approval Authority), so Milton's building permit fees follow Santa Rosa County's fee schedule. The City of Milton separately charges its own development review, plan review and stormwater review fees (Resolution 2025-19, Attachment E), which are not included in this estimate. See the Santa Rosa County fee schedule
Schedule effective October 1, 2024. Last verified: September 6, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Milton Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Milton
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Milton building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMilton Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.
Permit fees for Milton are administered by Santa Rosa County; the fees shown are the Santa Rosa County schedule.
Estimate only. Confirm with the Santa Rosa County building department before applying.
Homeowners and contractors planning a project check Milton building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMilton Permit Fee FAQs
How Much Does a Building Permit Cost in Milton?
How Much Does a Roofing Permit Cost in Milton?
How Are Permit Fees Calculated in Milton?
What Surcharges Are Added to Permits in Milton?
Do I Need a Permit for a Small Residential Job in Milton?
Where Do These Fees Come From?
Other Jurisdictions in Santa Rosa County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.