Milton, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Milton, straight from the official fee schedule, with a free permit fee calculator below.

Building permits within Milton city limits are issued by the Santa Rosa County Building Department, not the City of Milton, per the city's own Unified Development Code (Table 3.2.1, Summary of Approval Authority), so Milton's building permit fees follow Santa Rosa County's fee schedule. The City of Milton separately charges its own development review, plan review and stormwater review fees (Resolution 2025-19, Attachment E), which are not included in this estimate. See the Santa Rosa County fee schedule

In Milton, a building permit for a $50,000 remodel runs $265.92 in permit fees, a $20,000 re-roof $190.28, a $10,000 HVAC change-out $106.00, a $10,000 electrical panel upgrade or rewire $106.00, and a $10,000 whole-house repipe $139.50. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Santa Rosa County, FL - Resolution No. 2025-29 (Development Services Fee Schedule, OR BK 4657 Pg 1706-1710, adopted 9/11/2025)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Building permits within Milton city limits are issued by the Santa Rosa County Building Department, not the City of Milton, per the city's own Unified Development Code (Table 3.2.1, Summary of Approval Authority), so Milton's building permit fees follow Santa Rosa County's fee schedule. The City of Milton separately charges its own development review, plan review and stormwater review fees (Resolution 2025-19, Attachment E), which are not included in this estimate. See the Santa Rosa County fee schedule

Schedule effective October 1, 2024. Last verified: September 6, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Milton Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Plumbing Permit Fees in Milton

Residential (1–2 family)
tiered rates (see fee table)
0–15 fixture
$100.50
Over 15 fixture
$100.50 + $1.50 per unit
Residential (1–2 family): With site-built shower (up to 15 fixtures)
$134.00 flat
Commercial / 3+ units
tiered rates (see fee table) (the capped top tier of $1,699.50 is the printed $199.50 base fee for up to 15 fixtures plus the printed $1,500.00 maximum additional-fixture charge for all other construction)
0–15 fixture
$199.50
15–515 fixture
$199.50 + $3.00 per unit
Over 515 fixture
$1,699.50
Commercial / 3+ units: With site-built shower (up to 15 fixtures)
$266.00 flat
Santa Rosa County - Administrative Fee (Commercial/All Other)
$55.00
Santa Rosa County - Administrative Fee (Residential)
$35.00
Santa Rosa County - State Surcharge
3% of the permit fee, minimum $4.00
Santa Rosa County - Plan Check Fee (Plans Submitted Separately) (if applicable)
62.9% of the permit fee
Sponsor This Page
Be the Featured Plumber in Milton

Homeowners and contractors planning a project check Milton plumbing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Milton Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
fixture
130 fixture
Estimated plumbing permit fee
$139.50
Plumbing permit fee$100.50
tiered rates (see fee table)
Santa Rosa County - Administrative Fee (Residential)$35.00
Santa Rosa County - State Surcharge$4.00
Total Estimate$139.50

Permit fees for Milton are administered by Santa Rosa County; the fees shown are the Santa Rosa County schedule.

Estimate only. Confirm with the Santa Rosa County building department before applying.

Sponsor This Page
Be the Featured Plumber in Milton

Homeowners and contractors planning a project check Milton plumbing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Milton Permit Fee FAQs

How Much Does a Building Permit Cost in Milton?

The building permit for a $50,000 residential remodel runs $265.92, including the documented surcharges and minimum fees. The estimate is built from Milton's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Milton?

The roofing permit for a $20,000 residential re-roof runs $190.28, based on Milton's sourced fee schedule.

How Are Permit Fees Calculated in Milton?

A residential building permit is tiered rates (see fee table). Electrical, Mechanical / HVAC, and Roofing permits are flat fees; Plumbing permits are priced per fixture. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Milton?

On top of the base permit fee, the sourced schedule adds Santa Rosa County - Building Plan Check and Re-submittal Fee (62.9% of the permit fee), Santa Rosa County - Life Safety Fee (Final Inspection) - Residential (62.9% of the permit fee) and Santa Rosa County - State Surcharge (3% of the permit fee, minimum $4.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Milton?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Santa Rosa County, FL - Resolution No. 2025-29 (Development Services Fee Schedule, OR BK 4657 Pg 1706-1710, adopted 9/11/2025). See the official schedule. Last verified .

Other Jurisdictions in Santa Rosa County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.