Building Permit Fees in Oviedo, FL (2026)

In Oviedo, a $50,000 kitchen remodel runs about $610.00 in permit fees, an $8,000 HVAC change-out about $90.00, a $12,000 electrical panel upgrade or rewire about $94.00, an $8,000 whole-house repipe about $99.00, and a new $350,000 single-family home about $4,270.00. Totals include the documented surcharges and minimum fees, with unit-priced trades assuming a typical job scope — pick a project to load it in the calculator below.

Covers building, electrical, plumbing, and mechanical/HVAC permits. Fees from City of Oviedo Building Services Fees, Effective 10/1/22 (Resolution 4248-22), last verified July 20, 2026.

Fee details

Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.

All projects
$50.00 for the first $2,000, plus $6.00 per additional $1,000 of job value
FL Statutory Surcharge (553.721 & 468.631)
2.5% of the permit fee, minimum $4.00
Source

City of Oviedo Building Services Fees, Effective 10/1/22 (Resolution 4248-22)

Schedule effective October 1, 2022. Last verified: July 20, 2026

Fee calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Oviedo are the same either way.

$
$500$50,000
Estimated mechanical / hvac permit fee
$90.00
Mechanical / HVAC permit fee$86.00
$50.00 for the first $2,000, plus $6.00 per additional $1,000 of job value
FL Statutory Surcharge (553.721 & 468.631)$4.00
Source verbatim: "2.5% of all permit and plan review fees, minimum $4.00" (Florida Statutes 468.631 & 553.721). This is Oviedo's single combined line for the two FL statutory surcharges (normally 1% + 1.5% = 2.5%, each min $2, combined min printed as $4.00), loaded as printed. Modeled here as percent_of_permit_fee computed on the base permit fee only, per this project's Add-Ons calc semantics. Source text states the base also includes plan review fees (also loaded as a separate Add-On below) — the schema has no mechanism for one percent-of-permit-fee Add-On to include another Add-On in its base, so the modeled surcharge will UNDERSTATE the true combined total by roughly 2.5% x (plan review fee amount) whenever the Plan Review Fee add-on also applies. E.g. for a $50,000 job: true surcharge on $400 permit + $200 plan review = 2.5% x $600 = $15; modeled surcharge = 2.5% x $400 = $10 (a $5 understatement). Applies to all permit types per FL statute (Applies To Permit Types left blank = all).
Total estimate$90.00

Fees are charged on the value your jurisdiction assigns to the work — many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.

Estimate only. Confirm with the Oviedo building department before applying.