FreeEvery fee straight from the official city and county fee schedules. No signup.

St. Augustine, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for St. Augustine, straight from the official fee schedule, with a free permit fee calculator below.

A note on these figures from the official schedule. Details

Properties in St. Augustine's archaeological zones pay a separate archaeology fee (City Code Sec. 6-8) with building permits for ground-disturbing work of 100 square feet or more: 1.5% of project cost in Zone I, 1.25% in Zone II, 1% in Zone III, minimum $50, maximum $25,000 at application. It is not included in these estimates; ask the Planning and Building Department whether your property and project are covered. Work on historic properties may also need a Historic Architectural Review Board certificate ($250 to $350, Res. 2026-15 Exhibit A). See the official notice

In St. Augustine, a building permit for a $50,000 remodel runs $2,725.00 in permit fees, a $20,000 re-roof $379.32, a $10,000 HVAC change-out $204.08, a $10,000 electrical panel upgrade or rewire $307.81, and a $10,000 whole-house repipe $253.13. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of St. Augustine Resolution 2026-15 (adopted July 27, 2026), Exhibit B, Building Permit Fee Schedule

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the St. Augustine permit portal, or call 904-825-1065.

Schedule effective July 27, 2026. Last verified: September 27, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

St. Augustine Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in St. Augustine

Roof
$320.07 flat
Administrative Fee (Tier 1, Simple Permit)
$50.00†
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00 (on the combined administrative, inspection and plan review fees)†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00 (on the combined administrative, inspection and plan review fees)†
After-Hours Inspection (if applicable)
$200.00
Permit Re-instatement or Extension Fee (if applicable)
$50.00
Permit Transfer to New Contractor (if applicable)
$50.00
Re-inspection Fee (if applicable)
$136.78
Re-inspection Fee (Second and Each Later) (if applicable)
$547.12 (4 times the $136.78 inspection fee)†

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured Roofer in St. Augustine

Homeowners and contractors planning a project check St. Augustine roofing permit fees here first. One sponsor per trade, $69 a month, month to month.

Run a roofing business? Leave your email and we'll send availability and how it works.

Or see sponsor details

St. Augustine Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Estimated roofing permit fee
$379.32
Included in this total
Roofing Permit Fee$320.07
$320.07 flat
Administrative Fee (Tier 1, Simple Permit)$50.00
State Building Code Administrators Surcharge (F.S. 468.631)$5.55
State Building Permit Surcharge (F.S. 553.721)$3.70
Total Estimate$379.32
A note on these figures from the official schedule. Details

Properties in St. Augustine's archaeological zones pay a separate archaeology fee (City Code Sec. 6-8) with building permits for ground-disturbing work of 100 square feet or more: 1.5% of project cost in Zone I, 1.25% in Zone II, 1% in Zone III, minimum $50, maximum $25,000 at application. It is not included in these estimates; ask the Planning and Building Department whether your property and project are covered. Work on historic properties may also need a Historic Architectural Review Board certificate ($250 to $350, Res. 2026-15 Exhibit A). See the official notice

Estimate only. Confirm with the St. Augustine building department before applying. Apply online. Phone: 904-825-1065. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Roofer in St. Augustine

Homeowners and contractors planning a project check St. Augustine roofing permit fees here first. One sponsor per trade, $69 a month, month to month.

Run a roofing business? Leave your email and we'll send availability and how it works.

Or see sponsor details

How to Apply for a Permit in St. Augustine

St. Augustine issues its own building permits through the Planning and Building Department at City Hall, 75 King Street (Lobby B, 4th Floor). All permit applications must be submitted online through the city's Permit Portal (Google Chrome required), with the documents listed for your permit type. Create a portal account, submit the application, check its status in the portal, and pay the required permit fees before the permit is issued. For inspections, contact buildinginspection@citystaug.com, and schedule a final inspection when the work is complete. Buildings more than 50 years old may need Historic Architectural Review Board approval first.

Source: St. Augustine application instructions

Apply online: St. Augustine permit portal
Building Department Contact
Inspections
buildinginspection@citystaug.com
Address
75 King Street, Lobby B, 4th Floor, St. Augustine, FL 32084
Hours
Monday to Friday, 8:00 AM to 5:00 PM (closed major holidays)

St. Augustine Permit Fee FAQs

How Much Does a Building Permit Cost in St. Augustine?

The building permit for a $50,000 residential remodel runs $2,725.00, including the documented surcharges and minimum fees. The estimate is built from St. Augustine's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in St. Augustine?

The roofing permit for a $20,000 residential re-roof runs $379.32, based on St. Augustine's sourced fee schedule.

How Are Permit Fees Calculated in St. Augustine?

A residential building permit is $1,608.53 flat. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in St. Augustine?

On top of the base permit fee, the sourced schedule adds State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00 (on the combined administrative, inspection and plan review fees)) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00 (on the combined administrative, inspection and plan review fees)). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in St. Augustine?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from City of St. Augustine Resolution 2026-15 (adopted July 27, 2026), Exhibit B, Building Permit Fee Schedule. See the official schedule. Last verified .

Other Jurisdictions in St. Johns County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.