FreeEvery fee straight from the official city and county fee schedules. No signup.

Wildwood, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Wildwood, straight from the official fee schedule, with a free permit fee calculator below.

Sumter County Building Services issues building permits and does plan review and inspections for the City of Wildwood under the Building Services Sub-Agreement (Sumter County Ordinance 2020-09, August 11, 2020), which bases fees for permits within the city on the county's fee schedule; the fees shown are the county's schedule. Wildwood handles its own zoning: the city charges a $35 residential site plan zoning clearance (required before a building permit) and a $35 residential accessory structure compliance review, and commercial projects need city site plan approval ($2,000 including one resubmittal, or $500 for a minor site plan); these city fees are paid to the city and are not included in these estimates. See the Sumter County fee schedule

In Wildwood, a building permit for a $50,000 remodel runs $522.15 in permit fees, a $20,000 re-roof $149.00, a $10,000 HVAC change-out $110.00, a $10,000 electrical panel upgrade or rewire $110.00, and a $10,000 whole-house repipe $110.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Sumter County Building Services Fee Schedule (Res. 2024-21, effective October 1, 2024, as re-adopted by Res. 2024-50), posted on the county's Permitting Fees webpage

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Sumter County Building Services issues building permits and does plan review and inspections for the City of Wildwood under the Building Services Sub-Agreement (Sumter County Ordinance 2020-09, August 11, 2020), which bases fees for permits within the city on the county's fee schedule; the fees shown are the county's schedule. Wildwood handles its own zoning: the city charges a $35 residential site plan zoning clearance (required before a building permit) and a $35 residential accessory structure compliance review, and commercial projects need city site plan approval ($2,000 including one resubmittal, or $500 for a minor site plan); these city fees are paid to the city and are not included in these estimates. See the Sumter County fee schedule

Schedule effective October 1, 2024. Last verified: September 28, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Wildwood Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Wildwood

Residential (1–2 family) (remodel/alteration)
$82.00 flat
Residential (1–2 family) (new construction)
$121.00 flat
Commercial / 3+ units
$90.00 per 1,500 square feet or fraction thereof‡
Commercial / 3+ units: Low voltage
$18.00 flat
Commercial / 3+ units: Miscellaneous/minor work (single permit fees)
$82.00 flat‡
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Sumter County Unincorp - Plan Review Fee (Commercial)
$59.00 ($59 minimum (first 30 minutes), then $59 per half hour)‡
Sumter County Unincorp - Processing Fee for All Permits
$24.00
Sumter County Unincorp - After-Hours Inspection (weekend, holiday, after hours; 3-hour minimum) (if applicable)
$352.00
Sumter County Unincorp - Re-Inspection Fee (per re-inspection) (if applicable)
$82.00

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Wildwood

Homeowners and contractors planning a project check Wildwood electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Wildwood Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Estimated electrical permit fee
$110.00
Included in this total
Electrical Permit Fee$82.00
$82.00 flat
Sumter County Unincorp - Processing Fee for All Permits$24.00
State Building Code Administrators Surcharge (F.S. 468.631)$2.00
State Building Permit Surcharge (F.S. 553.721)$2.00
Total Estimate$110.00

Permit fees for Wildwood are administered by Sumter County; the fees shown are the Sumter County schedule.

Estimate only. Confirm with the Sumter County building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Wildwood

Homeowners and contractors planning a project check Wildwood electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Wildwood Permit Fee FAQs

How Much Does a Building Permit Cost in Wildwood?

The building permit for a $50,000 residential remodel runs $522.15, including the documented surcharges and minimum fees. The estimate is built from Wildwood's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Wildwood?

The roofing permit for a $20,000 residential re-roof runs $149.00, based on Wildwood's sourced fee schedule.

How Are Permit Fees Calculated in Wildwood?

A residential building permit is $486.00 flat. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Wildwood?

On top of the base permit fee, the sourced schedule adds State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Wildwood?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Sumter County Building Services Fee Schedule (Res. 2024-21, effective October 1, 2024, as re-adopted by Res. 2024-50), posted on the county's Permitting Fees webpage. See the official schedule. Last verified .

Other Jurisdictions in Sumter County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.