FreeEvery fee straight from the official city and county fee schedules. No signup.

Branford, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Branford, straight from the official fee schedule, with a free permit fee calculator below.

Building permit administration and fees for Branford are delegated to Suwannee County under Town of Branford Code Sec. 8-2 (Ordinance No. 94-6, 1994), which adopts the county's building fee schedule for the town. The town clerk separately collects a mobile home siting permit fee under Town Code Sec. 8-58; that amount is not published, so it is not included in these estimates. See the Suwannee County fee schedule

Every documented fee up top, then calculate an itemized estimate for your job below.

Source

Suwannee County Building Department Permit Fee Schedule (as of 10/22/2025)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Building permit administration and fees for Branford are delegated to Suwannee County under Town of Branford Code Sec. 8-2 (Ordinance No. 94-6, 1994), which adopts the county's building fee schedule for the town. The town clerk separately collects a mobile home siting permit fee under Town Code Sec. 8-58; that amount is not published, so it is not included in these estimates. See the Suwannee County fee schedule

How Branford values a job: Suwannee County prices new single-family dwellings and additions by floor area (42 cents per square foot of habitable area, 28 cents per square foot non-habitable). Remodels, commercial construction, and trade permits are priced on the applicant's stated contract price or job cost.

Schedule effective October 22, 2025. Last verified: September 6, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Branford Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Branford

All projects
$150.00 for the first $1,000, plus $5.00 per additional $1,000 of job value or fraction thereof
Addition priced by square footage (habitable)
$0.42 per sq ft (habitable floor area)
Addition priced by square footage (non-habitable)
$0.28 per sq ft (non-habitable floor area: porches, garages, carports)
Residential (1–2 family)
$0.42 per sq ft (habitable floor area)
Residential (1–2 family): Non-habitable area (porches/garages/carports)
$0.28 per sq ft (non-habitable floor area: porches, garages, carports)
Commercial / 3+ units
$150.00 for the first $1,000, plus $5.00 per additional $1,000 of job value or fraction thereof
911 Address Fee (new construction)
$50.00
Application Fee
$25.00
County Driveway Permit Fee (new construction)
$50.00
Plan Review (new construction)
$25.00
State Surcharge (F.S. 553.721 and 468.631)
2.5% of the permit fee, minimum $4.00
Zoning Fee (new construction)
$50.00

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Branford

Homeowners and contractors planning a project check Branford building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Branford Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
$
$2,500$500,000
Estimated building permit fee
$429.88
Building permit fee$395.00
$150.00 for the first $1,000, plus $5.00 per additional $1,000 of job value or fraction thereof
Application Fee$25.00
State Surcharge (F.S. 553.721 and 468.631)$9.88
Total Estimate$429.88

Suwannee County prices new single-family dwellings and additions by floor area (42 cents per square foot of habitable area, 28 cents per square foot non-habitable). Remodels, commercial construction, and trade permits are priced on the applicant's stated contract price or job cost.

Permit fees for Branford are administered by Suwannee County; the fees shown are the Suwannee County schedule.

Estimate only. Confirm with the Suwannee County building department before applying.

Sponsor This Page
Be the Featured General Contractor in Branford

Homeowners and contractors planning a project check Branford building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Branford Permit Fee FAQs

How Much Does a Building Permit Cost in Branford?

The building permit for a $50,000 residential remodel runs $429.88, including the documented surcharges and minimum fees. The estimate is built from Branford's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Are Permit Fees Calculated in Branford?

A residential building permit is $150.00 for the first $1,000, plus $5.00 per additional $1,000 of job value or fraction thereof. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Branford?

On top of the base permit fee, the sourced schedule adds State Surcharge (F.S. 553.721 and 468.631) (2.5% of the permit fee, minimum $4.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Branford?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Suwannee County Building Department Permit Fee Schedule (as of 10/22/2025). See the official schedule. Last verified .

Other Jurisdictions in Suwannee County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.