Live Oak, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Live Oak, straight from the official fee schedule, with a free permit fee calculator below.
In Live Oak, a building permit for a $50,000 remodel runs $571.88 in permit fees, a $20,000 re-roof $305.00, a $10,000 HVAC change-out $124.00, and a $10,000 electrical panel upgrade or rewire $149.18. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Live Oak Code of Ordinances, Appendix A, Live Oak Fee Schedule (Municode)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Call the building department at (386) 362-2009.
How Live Oak values a job: Valuation is based on the contract price for the work; where no contract price exists, the city uses $50 per square foot for heated residential area, $35 per square foot for non-heated residential area, $12 per square foot for uncovered concrete area, or $55 per square foot for commercial and industrial buildings.
Schedules effective October 14, 2003 – April 9, 2024. Last verified: September 26, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Live Oak Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Roofing Permit Fees in Live Oak
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Live Oak roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageLive Oak Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Live Oak are the same either way.
‡ Awaiting confirmation from the jurisdiction.
Valuation is based on the contract price for the work; where no contract price exists, the city uses $50 per square foot for heated residential area, $35 per square foot for non-heated residential area, $12 per square foot for uncovered concrete area, or $55 per square foot for commercial and industrial buildings.
Estimate only. Confirm with the Live Oak building department before applying. Phone: (386) 362-2009. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Live Oak roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Live Oak
Live Oak does not use an online permit portal. Download the correct application from the Building Department page (residential, commercial, demolition, fence, manufactured home and others), fill it in, and email it to the Building Department at loannex@cityofliveoak.org (attention: Building Secretary), or deliver it to the office of the Building Official at the City Hall Annex, 416 Howard Street East. New housing and accessory buildings need zoning review and approval before the building permit application, and commercial plans are submitted to the City Development Manager's office for plan review. Permit fees are paid to the city before the permit is issued. Call the Building Department at (386) 362-2009 to request inspections.
Source: Live Oak application instructions
- Phone
- (386) 362-2009
- Building Official
- Tony Marrillia, AMarrillia@CityofLiveOak.org
- Address
- Annex Building, 416 Howard Street East, Live Oak, FL 32064
- Mailing
- 101 White Avenue SE, Live Oak, FL 32064
- Hours
- not published on the Building Department page
- Source
- Official contact page
Live Oak Permit Fee FAQs
How Much Does a Building Permit Cost in Live Oak?
How Much Does a Roofing Permit Cost in Live Oak?
How Are Permit Fees Calculated in Live Oak?
What Surcharges Are Added to Permits in Live Oak?
Do I Need a Permit for a Small Residential Job in Live Oak?
Where Do These Fees Come From?
Other Jurisdictions in Suwannee County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.