Smithville, TX Permit Fees (2026)
Building, electrical, plumbing, and mechanical/HVAC permit fees for Smithville, straight from the official fee schedule, with a free permit fee calculator below.
A note on these figures from the official schedule. Details
Reroofing and roof repairs need no City permit (Code Sec. 3.02.032). Commercial electrical, plumbing and HVAC permits are shown at the City's printed $150 minimum commercial fee; the schedule prints no other commercial trade pricing. Water and sewer taps, utility deposits, impact fees, fire alarm or sprinkler inspections, re-inspections and a $4 card processing fee are extra, and work started without a permit is charged three times the permit fee.
In Smithville, a building permit for a remodel runs $130.00 in permit fees, a $10,000 HVAC change-out $100.00, and a $10,000 whole-house repipe $200.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Smithville Fee Schedule, Exhibit A to Resolution 2026-09-586 (passed September 14, 2026; effective October 1, 2026)
Covers building, electrical, plumbing, and mechanical/HVAC permits.
Call the building department at 512-237-3282.
Schedule effective October 1, 2026. Last verified: November 20, 2026
Smithville Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Smithville
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Smithville building permit fees here first.
One sponsor per trade, flat monthly rate.
Smithville Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
5 documented rates for this permit type; pick the one that matches your job.
A note on these figures from the official schedule. Details
Reroofing and roof repairs need no City permit (Code Sec. 3.02.032). Commercial electrical, plumbing and HVAC permits are shown at the City's printed $150 minimum commercial fee; the schedule prints no other commercial trade pricing. Water and sewer taps, utility deposits, impact fees, fire alarm or sprinkler inspections, re-inspections and a $4 card processing fee are extra, and work started without a permit is charged three times the permit fee.
Estimate only. Confirm with the Smithville building department before applying. Phone: 512-237-3282. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Smithville building permit fees here first.
One sponsor per trade, flat monthly rate.
How to Apply for a Permit in Smithville
Apply in person at Smithville City Hall, 317 Main Street. Fill out the Building Permit Application (a fillable PDF on the Permits page) and the building, electrical and plumbing permit forms; there is no online permit portal.
Submit a plat or survey showing your property pins, or a to-scale drawing (at least 8 by 10 inches, 1/8 inch to 1 foot, north marked) showing where the project will be built, its dimensions, its square footage and its distance from every property line. Permits are not issued until the building official approves the plans; plan review can take up to ten workdays.
Electrical and plumbing work must be permitted by a contractor registered with the City unless you are working on your own homestead and have a signed, notarized affidavit on file at City Hall; all gas work requires a licensed plumber. Owners may do their own foundation, roofing and carpentry work.
Call City Hall with 24 hours notice to schedule inspections (typically foundation, framing, electrical and plumbing rough-in, and final). Some projects need a Certificate of Occupancy before utilities are switched to full service.
Source: Smithville application instructions
- Phone
- 512-237-3282
- Address
- City Hall, 317 Main Street, P.O. Box 449, Smithville, TX 78957
- Hours
- 7:30 A.M. to 5:00 P.M., Monday to Friday
- Source
- Official contact page
Your name, phone and website right here, next to the building department's contact info, where people look right before they apply.
One expediter per county.
Smithville Permit Fee FAQs
How Much Does a Building Permit Cost in Smithville?
How Are Permit Fees Calculated in Smithville?
What Surcharges Are Added to Permits in Smithville?
Where Do These Fees Come From?
Other Jurisdictions in Bastrop County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.