Hardin, TX Permit Fees (2026)
Building permit fees and building, electrical, plumbing, and roofing permit fees for Hardin, straight from the official fee schedule, with a free permit fee calculator below.
Hardin's fee ordinance (Ordinance 2021-1108) is not posted online, so these estimates use the fees printed on the City's current permit application forms. Commercial new construction uses the application's $0.40 per sq ft with a $200 minimum; the City's Permit Manual prints $0.30 per sq ft with a $400 minimum, so confirm with City Hall at (936) 298-2117. Sewer tap and connection charges and driveway or culvert permits are separate.
In Hardin, a building permit for a remodel runs $50.00 in permit fees, a re-roof $400.00, and a $10,000 electrical panel upgrade or rewire $50.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area and a 2,000 sq ft roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Hardin permit application forms (Building Permit Application p. 2, Electrical Permit Application, Manufactured Home Permit Application p. 2, Wastewater Permit Application p. 1), citing Ordinance 2021-1108 Fee Schedule
Covers building, electrical, plumbing, and roofing permits.
Call the building department at (936) 298-2117.
Last verified: November 3, 2026
Hardin Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Hardin
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Hardin electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHardin Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Hardin's fee ordinance (Ordinance 2021-1108) is not posted online, so these estimates use the fees printed on the City's current permit application forms. Commercial new construction uses the application's $0.40 per sq ft with a $200 minimum; the City's Permit Manual prints $0.30 per sq ft with a $400 minimum, so confirm with City Hall at (936) 298-2117. Sewer tap and connection charges and driveway or culvert permits are separate.
Estimate only. Confirm with the Hardin building department before applying. Phone: (936) 298-2117. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Hardin electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Hardin
Download the permit application from the City's Permits and Inspections page (building, electrical, manufactured home or wastewater permit), fill it out, and return it to City Hall at 142 CR 2010, Liberty, TX 77575 with a copy of the deed of record, building plans, and the contractor's State of Texas license and insurance; fees are paid at submittal. Contractors must also register with the City each year. The City has no online permit portal. Inspections are scheduled by calling City Hall 24 hours in advance, and you must give the City a copy of your inspection reports. Shingle-only reroofs need no permit.
Source: Hardin application instructions
- Phone
- (936) 298-2117
- Address
- 142 CR 2010, Liberty, TX 77575
- Hours
- Monday to Thursday 8:00 a.m. to 5:00 p.m.; Friday 10:00 a.m. to 5:00 p.m.
- Source
- https://www.hardintexas.com/permits-and-inspections ; https://www.hardintexas.com/city-hall ; https://www.hardintexas.com/city-secretary
Hardin Permit Fee FAQs
How Much Does a Building Permit Cost in Hardin?
How Much Does a Roofing Permit Cost in Hardin?
How Are Permit Fees Calculated in Hardin?
Where Do These Fees Come From?
Other Jurisdictions in Liberty County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.