FreeEvery fee straight from the official city and county fee schedules. No signup.

Cut and Shoot, TX Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Cut and Shoot, straight from the official fee schedule, with a free permit fee calculator below.

Residential remodels and additions need no city building permit, so no estimate is shown for them. Work started without a permit pays double the permit fee. Commercial work of $50,000 or more also registers with the Texas Department of Licensing and Regulation (fee paid to the state).

In Cut and Shoot, a $20,000 re-roof runs $110.00 in permit fees, a $10,000 HVAC change-out $220.00, an electrical panel upgrade or rewire $220.00, and a whole-house repipe $220.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume 2 county-assigned inspections. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of Cut and Shoot Ordinance No. 135, Municipal Building Permit Inspection-Plan Review Fee Schedule (Exhibits A and B)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Call the building department at (936) 264-3100.

How Cut and Shoot values a job: Commercial valuation follows the ICC Building Valuation Data table (August 2012) for new buildings and additions, and project valuation for alterations and build-outs, as determined by the building official.

Schedule effective April 29, 2021. Last verified: November 3, 2026

Cut and Shoot Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Cut and Shoot

Residential (1–2 family): Residential electrical, building up to 5,000 sq ft
$75.00 per inspection‡
Residential (1–2 family): Residential electrical, building over 5,000 sq ft
$100.00 per inspection‡
Residential (1–2 family): Residential meter loop or service
$100.00 flat
Commercial / 3+ units: Commercial electrical, building up to 5,000 sq ft
$75.00 per inspection‡
Commercial / 3+ units: Commercial electrical, building 5,001 to 10,000 sq ft
$100.00 per inspection‡
Commercial / 3+ units: Commercial electrical, building over 10,000 sq ft
$150.00 per inspection‡
Commercial / 3+ units: Parking lot light poles
tiered rates by poles
Up to 2 poles
$75.00
Over 2 poles
$75.00 plus $15.00 per additional pole
Electrical reconnection or turn on (per building, inspection included)
$75.00 flat
Electrical yard light (inspection included)
$75.00 flat
Generator (electrical ground, rough and final inspections)
$275.00 flat
Swimming pool or spa only (trench and final inspections)
$200.00 flat
Temporary power pole (inspection included)
$75.00 flat
City Administrative Charge
10% of the permit fee (10% of each fee charged, including plan review and base fees)‡
Trade Base Permit Fee (select fee rules only)
$50.00
Trade Base Permit Fee (itemized trade permits) (select fee rules only)
$50.00‡
Additional Inspection (building, site development or miscellaneous) (if applicable)
$75.00
Expired Permit Renewal (if applicable)
50% of the permit fee
Re-inspection Fee (if applicable)
$75.00
Special Inspection, Weekday After Hours (if applicable)
$150.00
Special Inspection, Weekend or City Holiday (if applicable)
$225.00

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Cut and Shoot

Homeowners and contractors planning a project check Cut and Shoot electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Cut and Shoot Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

8 documented rates for this permit type; pick the one that matches your job.

inspections
110 inspections
Estimated electrical permit fee
$220.00
Included in this total
Electrical Permit Fee$150.00‡
2 inspections × $75.00 per inspection
Trade Base Permit Fee$50.00
City Administrative Charge$20.00‡
Total Estimate$220.00

‡ Awaiting confirmation from the jurisdiction.

Residential remodels and additions need no city building permit, so no estimate is shown for them. Work started without a permit pays double the permit fee. Commercial work of $50,000 or more also registers with the Texas Department of Licensing and Regulation (fee paid to the state).

Estimate only. Confirm with the Cut and Shoot building department before applying. Phone: (936) 264-3100. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Cut and Shoot

Homeowners and contractors planning a project check Cut and Shoot electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Cut and Shoot

Fill out the City's Residential Permit Application (online form on the Building Permits page, or the downloadable PDF) or the Commercial Permit Application, and submit it with plans to the City office. Bureau Veritas reviews plans and performs inspections for the City. Every contractor must register with the City before working inside the city limits (Contractor Registration Form with a copy of the driver's license and state license). All fees are paid to the City before the permit is issued. Remodels and additions to existing homes do not need a city permit; call the City office with questions.

Source: Cut and Shoot application instructions

Building Department Contact
Address
14391 Hwy 105 East, Conroe, TX 77306
Hours
Monday to Friday, 8 a.m. to 12 p.m. and 1 p.m. to 4:45 p.m.
Source
https://cutandshoot.org/city-secretary ; https://cutandshoot.org/contact-us

Cut and Shoot Permit Fee FAQs

How Much Does a Roofing Permit Cost in Cut and Shoot?

The roofing permit for a $20,000 residential re-roof runs $110.00, based on Cut and Shoot's sourced fee schedule.

How Are Permit Fees Calculated in Cut and Shoot?

Electrical and Plumbing permits are priced per inspection; Mechanical / HVAC permits are flat fees for the default job (Complete HVAC change-out or new system, inspections included), while new construction is priced per inspection; Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Cut and Shoot?

On top of the base permit fee, the sourced schedule adds City Administrative Charge (10% of the permit fee (10% of each fee charged, including plan review and base fees)) and Plan Review Fee (50% of the permit fee, jobs over $1,000 only). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Cut and Shoot Ordinance No. 135, Municipal Building Permit Inspection-Plan Review Fee Schedule (Exhibits A and B). See the official schedule. Last verified .

Other Jurisdictions in Montgomery County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.