FreeEvery fee straight from the official city and county fee schedules. No signup.

Buckeye, AZ Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Buckeye, straight from the official fee schedule, with a free permit fee calculator below.

In Buckeye, a building permit for a $50,000 remodel runs $2,582.25 in permit fees, a $20,000 re-roof $1,075.80, a $10,000 electrical panel upgrade or rewire $153.00, and a $10,000 whole-house repipe $927.30. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of Buckeye Development User Fee Schedule (effective May 21, 2026; adopted May 5, 2026 by Resolution 38-26)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Buckeye permit portal, or call 623-349-6200.

How Buckeye values a job: Buckeye prices valuation-based permits from a stated or calculated total valuation, and its Building Valuation Data chart is updated annually from the current ICC-published figures.

Schedule effective May 21, 2026. Last verified: October 9, 2026

Buckeye Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Buckeye

Residential (1–2 family): Above-ground pool or spa
$223.00 flat
Residential (1–2 family): Demolition of a residential accessory structure
$179.00 flat
Residential (1–2 family): Demolition of a single family residence
$232.00 flat
Residential (1–2 family): In-ground pool and spa combination with approved standard plan
$329.00 flat
Residential (1–2 family): In-ground pool with approved standard plan
$329.00 flat
Residential (1–2 family): Manufactured home set
$350.00 flat
Residential (1–2 family): Prefabricated in-ground spa
$276.00 flat
Residential (1–2 family): Site-built in-ground spa
$452.00 flat
New home, addition, remodel, deck, patio, tenant improvement, or other building work (Table 1-A valuation fee)
tiered rates by job value
Band bases are stored as printed, and the city bills them that way: the fee is a flat $72 up to $500 and $270 plus $15 per $100 above it, some printed bases differ from the band below by $5 to $25 (for example $1,570 printed at $50,000 where the lower band computes $1,565), and the fee drops $11 just above $1,000,000 ($16,880 at $1,000,000, $16,869 at $1,000,001).
Up to $500
$72.00
Over $500, up to $2,000
$270.00 plus $15.00 per additional $100
Over $2,000, up to $25,000
$490.00 plus $9.00 per additional $1,000
Over $25,000, up to $50,000
$690.00 plus $35.00 per additional $1,000
Over $50,000, up to $100,000
$1,570.00 plus $16.50 per additional $1,000
Over $100,000, up to $500,000
$2,405.00 plus $13.00 per additional $1,000
Over $500,000, up to $1,000,000
$7,630.00 plus $18.50 per additional $1,000
Over $1,000,000
$16,864.00 plus $5.00 per additional $1,000
Demolition of a structure other than a single family residence
$260.00 flat
Pool barrier fence
$223.00 flat
Plan Review Fee (select fee rules only)
65% of the permit fee
Plot Plan Review Fee (Residential Homes) (new construction)
$54.00‡
Building Code Modification or Alternative Request (if applicable)
$608.00
Certificate of Completion (if applicable)
$87.00
Certificate of Occupancy (if applicable)
$140.00
Change of Occupancy Permit (if applicable)
$228.00
Change of Occupant Permit (if applicable)
$166.00
Deferred Truss Calculation Review (Residential) (if applicable)
$280.00
Inspection Outside Normal Business Hours (if applicable)
$420.00
Permit Extension (if applicable)
10% of the permit fee
Permit Revision Fee (if applicable)
$232.00
Re-inspection Fee (if applicable)
$106.00
Stock and Train (if applicable)
$163.00
Temporary Certificate of Occupancy (60 days) (if applicable)
$140.00
Temporary Certificate of Occupancy Extension, 121 to 180 Days (if applicable)
20% of the permit fee
Temporary Certificate of Occupancy Extension, 181 to 240 Days (if applicable)
30% of the permit fee
Temporary Certificate of Occupancy Extension, 61 to 120 Days (if applicable)
10% of the permit fee
Truss Calculation Review (Commercial) (if applicable)
$652.00
Work Commenced Before Permit Issuance (if applicable)
100% of the permit fee

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Buckeye

Homeowners and contractors planning a project check Buckeye building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Buckeye Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

11 documented rates for this permit type; pick the one that matches your job.

$
$2,500$500,000
Estimated building permit fee
$2,582.25
Included in this total
Building Permit Fee$1,565.00
$690.00 + 25 × $35.00 per $1,000 over $25,000 (see the fee table above)
Band bases are stored as printed, and the city bills them that way: the fee is a flat $72 up to $500 and $270 plus $15 per $100 above it, some printed bases differ from the band below by $5 to $25 (for example $1,570 printed at $50,000 where the lower band computes $1,565), and the fee drops $11 just above $1,000,000 ($16,880 at $1,000,000, $16,869 at $1,000,001).
Plan Review Fee$1,017.25
Total Estimate$2,582.25

Buckeye prices valuation-based permits from a stated or calculated total valuation, and its Building Valuation Data chart is updated annually from the current ICC-published figures.

Estimate only. Confirm with the Buckeye building department before applying. Apply online. Phone: 623-349-6200. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Buckeye

Homeowners and contractors planning a project check Buckeye building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Buckeye

Buckeye takes building permit applications by email: send a completed Permit Application and plans to permitcenter@buckeyeaz.gov. Select residential permits (gas lines, pools, spas, fences, electric meters, water heaters, temporary signs and single service dry utility) can be applied for online through the EnerGov Customer Self Service portal and are usually issued the same day when a complete submittal arrives by 2 p.m., limited to three applications per customer per day. A permit is not issued until all forms are complete, reviews are approved, and all assessed fees are paid. For help, call the Permit Center at 623-349-6200 or email permitcenter@buckeyeaz.gov.

Source: Buckeye application instructions

Apply online: Buckeye permit portal
Building Department Contact
Address
The Landing, 945 N. 215th Ave. Suite 137, Buckeye, AZ 85326
Hours
Monday through Friday, 8 a.m. to 5 p.m.

Buckeye Permit Fee FAQs

How Much Does a Building Permit Cost in Buckeye?

The building permit for a $50,000 residential remodel runs $2,582.25, including the documented surcharges and minimum fees. The estimate is built from Buckeye's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Buckeye?

The roofing permit for a $20,000 residential re-roof runs $1,075.80, based on Buckeye's sourced fee schedule.

How Are Permit Fees Calculated in Buckeye?

A residential building permit is tiered rates by job value. Electrical permits are flat fees; Plumbing and Roofing permits scale with the value of the job; Mechanical / HVAC permits are priced per system. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Buckeye?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (65% of the permit fee) and Plan Review Fee (valuation-priced trade and roofing permits) (65% of the permit fee). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Buckeye Development User Fee Schedule (effective May 21, 2026; adopted May 5, 2026 by Resolution 38-26). See the official schedule. Last verified .

Other Jurisdictions in Maricopa County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.