Cape Canaveral, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Cape Canaveral, straight from the official fee schedule, with a free permit fee calculator below.
In Cape Canaveral, a building permit for a $50,000 remodel runs $577.90 in permit fees, a $20,000 re-roof $338.49, a $10,000 HVAC change-out $232.50, a $10,000 electrical panel upgrade or rewire $232.50, and a $10,000 whole-house repipe $232.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Cape Canaveral Code of Ordinances, Appendix B - Schedule of Fees (Municode, Supplement 34, codified through Resolution No. 04-2025, adopted 9/16/2025)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Cape Canaveral values a job: Cape Canaveral values work at the actual construction contract price or a cost estimate using the latest ICC Building Valuation Data, whichever is greater, and never less than the ICC-based estimate.
Schedule effective September 16, 2025. Last verified: July 24, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Cape Canaveral Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Cape Canaveral
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Cape Canaveral electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageCape Canaveral Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Cape Canaveral values work at the actual construction contract price or a cost estimate using the latest ICC Building Valuation Data, whichever is greater, and never less than the ICC-based estimate.
Estimate only. Confirm with the Cape Canaveral building department before applying.
Homeowners and contractors planning a project check Cape Canaveral electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageCape Canaveral Permit Fee FAQs
How Much Does a Building Permit Cost in Cape Canaveral?
How Much Does a Roofing Permit Cost in Cape Canaveral?
How Are Permit Fees Calculated in Cape Canaveral?
What Surcharges Are Added to Permits in Cape Canaveral?
Do I Need a Permit for a Small Residential Job in Cape Canaveral?
Where Do These Fees Come From?
Other Jurisdictions in Brevard County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.